Laserfiche WebLink
The Vice Chairman continued to emphasize that he wanted to <br />associate a dollar figure with this and send Zaremba Corporation <br />a bill, as he believed they had about $40,000 in their budget for <br />this activity, but he did not want to set an amount until we have <br />a final design; he felt we could, at this time, just direct <br />Zaremba to design it. <br />Administrator Wright stated that he would prefer to design <br />this in-house if we are going to expand the existing facility. <br />Commissioner Wodtke asked if we could have another ramp just <br />west of the existing ramp, but it was explained that there is a <br />bend right there that would create a bad situation with cars <br />pulling out and backing into each other. <br />After further discussion, Vice Chairman Scurlock stated that <br />it would be his recommendation that staff go back and work with <br />Zaremba Corporation to come up with an acceptable plan, with the <br />understanding that the total cost is to be borne by them, and if <br />staff wishes to design it, they will be charged for staff time. <br />ON MOTION by Commissioner Bowman, SECONDED by <br />Commissioner Wodtke, the Board unanimously (3-0) <br />authorized staff to work with Zaremba Corp. as <br />per the Vice Chairman's recommendation. <br />APPEAL OF SHERATON, PROCTOR AND HODGES SITE PLAN APPROVAL <br />The hour of 9:15 o'clock A.M. having passed, the Deputy <br />Clerk read the following Notice with Proof of Publication <br />attached, to -wit: <br />13 <br />FEB 13 1995 Boor 59 F�0U 855 <br />J <br />