My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/20/1985
CBCC
>
Meetings
>
1980's
>
1985
>
3/20/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:12 AM
Creation date
6/12/2015 10:15:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/20/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � � <br />AGREEMENT AND WORK AUTHORIZATION - CONSULTING SERVICES FOR <br />REVERSE OSMOSIS PLANT <br />Attorney Brandenburg informed the Board that this is the <br />general consulting contract, with scope of services attached, <br />with DSS Engineering for consulting services and an independent <br />analysis of our existing R.O. plant. <br />MOTION WAS MADE by Commissioner Scurlock, SECONDED <br />by Commissioner Bowman, to approve the Agreement <br />for Professional Services with DSS Engineering, Inc., <br />and authorize the signature of the Chairman. <br />Commissioner Wodtke referred to the monthly fee set out and <br />wished to know how many months are involved. <br />Utilities Director Pinto stated it probably will be monthly <br />for a full year and then reduced to less than every month. <br />Attorney Brandenburg noted that mainly under this contract, <br />we contract with them on a use -them -as -we -need -them basis under <br />work authorizations the Board issues from time to time. <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />It was voted on and carried unanimously. <br />(Said Agreement for Professional Services is set out <br />as follows) <br />91 <br />MAR 2 0 1995 BOOK CA 0 PAGE 267 <br />
The URL can be used to link to this page
Your browser does not support the video tag.