My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/20/1985
CBCC
>
Meetings
>
1980's
>
1985
>
3/20/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:12 AM
Creation date
6/12/2015 10:15:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/20/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 EVALUATE OPERATING STAFF TRAINING <br />a. deterimine training & certification levels <br />b. recommend training plan & schedule <br />7 PLANT EVALUATION REPORT <br />a. executive summary <br />b. introduction _ <br />C. plant history <br />d. technical discussions <br />1. present operating methods <br />2. pretreatment system <br />3. lab practices <br />4. membrane maintenance & life <br />5., plant maintenance <br />6. product treatment & storage <br />7. plant safety <br />8. plant performance <br />9. warrantee items <br />e. cost analysis <br />f. technical opinion and recommendations on warrantee items <br />g. recommendations and conclusions <br />page 2 <br />f <br />t <br />8 REVIEW MEETING WITH COUNTY <br />a. review the warrantee items with the county legal and technical staff f <br />b. review the plant evaluation report with the county + <br />c. assist county with plan to.resolve warrantee problems with contractors{ <br />d. present recommendations on plant operations & maintenance f <br />e. present recommendations on plant modifications and improvements + <br />TASK A BUDGET ESTIMATE ......... 25806 <br />TASK B. PERIODIC VISITS AND CONTINUING CONSULTING SERVICES <br />I MONTHLY INSPECTIONS OF REVERSE OSMOSIS PLANT <br />(TO BEGIN AFTER PLANT EVALUATION REPORT IS COMPLETED) <br />a. one plant inspection each month by Project Manager <br />b. inspect plant equipment <br />c. review and record plant operating data <br />d. record maintenance records <br />e. review operations & maintenance procedures <br />2 PREPARE MONTHLY SUMMARY REPORT <br />a. water production, on stream factors, capacity factors <br />b. production costs, electricity & chemical costs <br />c. plant performance, recovery rates, salt passage, pressures <br />d. plant maintenance <br />e. potential problems and recommendations <br />TASK, B MONTHLY FEE ............. $1138.50 <br />TASK C. MAJOR MODIFICATIONS & IMPROVEMENTS <br />a. design <br />b. cost estimates <br />c. procurement documents <br />d. construction supervision <br />e. special reports <br />SECTION TWO <br />CONTINUING CONSULTING SERVICES FOR POSSIBLE DESIGN EXPANSION <br />AND PERMITTING REQUIREMENTS OF REGULATORY AGENCIES <br />TASK I PROJECT DEFINITION <br />a. review county expansion plan <br />b. define expansion in terms of capacity, budget, schedule <br />c. prepare written project scope <br />TASK 2 PROCESS DESIGN AR 2 0 1995 <br />a. examine various concepts -for expansion <br />b. examine existing plant in terms of expansion capability <br />ce prepare process flow sheet <br />per diem rates <br />BOOR 60 pnE 275 <br />
The URL can be used to link to this page
Your browser does not support the video tag.