My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/8/1985
CBCC
>
Meetings
>
1980's
>
1985
>
5/8/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:13 AM
Creation date
6/12/2015 10:23:05 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/08/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 9 1995 <br />BOOK 60 P,, ,U 865 <br />TO: DATE: FILE: <br />Michael Wright April 30, 1985 <br />County Administrator <br />SUBJECT: <br />FROM: REFERENCES: <br />James W. Davis, P.E., <br />Public Works Director <br />New Position/Right of <br />Way Agent <br />As requested during the 1984-85 Budget Session, the County <br />Engineering Department is in need of a Right -of -Way agent. This <br />position would benefit the County in the following ways: <br />1) Seek donation of road and drainage right-of-way for the <br />following on-going projects <br />a) Southerly Extension of Indian River Boulevard <br />b) Widening and Easterly extension of 12th Street and 8th <br />Street east of Old Dixie Highway. <br />c) Northerly extension of Indian River Boulevard. <br />d) Gifford area projects including Lindsey Road, South <br />Gifford Road, North Gifford Road and 43rd Avenue. <br />e) Kings Highway at SR 60 <br />f) Roseland Road at U.S. 1. <br />g) Lateral "A" Road north of CR 510. <br />h) Powerline Road north of CR 510. <br />i) Kings Highway from 8th Street to 1st Street S.W. <br />j) Various east/west collector roads spaced every h mile <br />through the County. <br />2) Be the custodian for the Right -of -Way atlas now being <br />prepared by Barton Aschman and Assoc. <br />3) Respond to the.general public and citizenry on right-of-way <br />questions. <br />4) Assist Utilities (water and sewer), Parks, Landfill, and <br />other County Departments with right-of-way or easement <br />acquisition. <br />This position will improve the efficiency of the Engineering <br />Department by allowing surveyors, designers, and drafting <br />personnel an uninterrupted working environment which now is <br />constantly interrupted with right-of-way questions. The County <br />will also receive more donated right-of-way which is not now <br />being pursued. <br />It is anticipated that a qualified person could be obtained for <br />Pay Grade 20 - $19,250 to $27,164. A job description is attached. <br />Administrator Wright stated there was no question about it; <br />he must get Director Davis some help in obtaining right-of-way <br />needed for roads and utilities. He noted that the job <br />description has been prepared and they are ready to advertise for <br />the position. <br />70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.