My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/22/1985
CBCC
>
Meetings
>
1980's
>
1985
>
5/22/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:13 AM
Creation date
6/12/2015 10:26:16 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/22/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FrAAAY 2 2 1985 <br />Date: May 22, 1985 <br />Work Authorization No. <br />INDIAN RIVER COUNTY <br />1 . for Consulting Services <br />BOOK 61 FACE 38 <br />Project No. 1 (County) 14340 (Sippel, Masteller, Lorenz & <br />Hoover, Inc.) <br />I. PROJECT DESCRIPTION <br />Title: Consulting Engineering services relative to the 82nd Avenue (Ranch <br />Road) 10" diameter water main extension south from Flamingo Drive <br />entrance to the Countryside Development to 8th Street and west <br />along 8th Street to the wastewater treatment plant site entrance <br />consisting of approximately 6,100 feet with valves, hydrants, and <br />appurtenances. Budget estimate for construction cost is $155,000.00. <br />II. SCOPE OF SERVICES AND LUMP SUM FEE FOR SERVICES <br />Reference is made to the "Agreement for Professional Services" <br />dated April 24, 1985 and specific Article numbers and paragroph <br />numbers which are listed hereinafter to describe the scope of <br />services included on this project: <br />A. Project Design Services per Article 4, paragraph 4a. and <br />4b. <br />B. General Services During Construction per Article 5, para- <br />graph 5a. and 5b. <br />C. Supplementary and Special Services per Article 6, paragraph <br />6c., 6d., 6e., 6f., and 6g. In addition, our services shall <br />include field surveys necessary for design and preparation <br />of construction plans and assistance to the County in ob- <br />taining various permits and approvals for construction (per- <br />mit fees to be paid by the County). <br />D. Payment for Services per Article 8, paragraph 8b., the lump <br />sum fee for A, B, and C above is $14,880.00. Payment shall <br />be per paragraph 8d. <br />APPROVED BY: <br />INDIAN VER COUTt <br />BOARD F OUNTY COMMISSIONERS <br />P XaM ck B. „y ,, <br />Chairman <br />Date: May 22, 1985 <br />APPROVED TO <br />SUFFICI CY: <br />ar ran e <br />Co my A torne <br />M <br />AND LEGAL <br />SUBMITTED BY: <br />SIPPEL, MASTELLER, LORENZ & HOOVER, INC. <br />Eaf'T H. Masteller; P.E. <br />Executive Vice -President <br />
The URL can be used to link to this page
Your browser does not support the video tag.