My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/5/1985
CBCC
>
Meetings
>
1980's
>
1985
>
6/5/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:13 AM
Creation date
6/12/2015 10:27:57 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/05/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN 5 1995 BOOK s FA,;F <br />Director Keating pointed out that the ones up front have to <br />be at least 2' in height; these are not in yet, and it is six <br />months after the fact. <br />Chairman Lyons asked if we could continue the Letter of <br />Credit, and Administrator.Wright stated that the Church would <br />have to do that and the Commission would have to agree to it. <br />Reverend Tipton wished to know exactly what is left to be <br />done and also wished to know if they are required to put sod over <br />the parking area again. He informed the Board that they have <br />four trailer loads of sod coming in to put around the lakes. He <br />believed everything else is done. <br />Administrator Wright noted that staff is pursuing this <br />simply because these are the rules we are supposed to abide by. <br />Chairman Lyons agreed and noted we did make an exception so <br />they could get their Certificate of Occupancy before everything <br />was completed. <br />Discussion continued at length re the need to pave the <br />parking lot, the cost involved, and the fact that the Church <br />hopes to build an auditorium in that area within two years. <br />Various alternatives to paving or putting grass sod over the <br />coquina rock presently there were reviewed, including an asphalt <br />cap or some type of bonding sealer recommended by church member, <br />Rick Foster. <br />Chairman Lyons did not believe we can re-engineer this <br />today, and suggested that the Church be given a further extension <br />and we come back with a recommendation of what to do about roads <br />and parking lots. He felt possibly we should build in some <br />requirement in regard to their building in this area within two <br />years. <br />Administrator Wright noted we will have to extend the bond <br />or have it replace with a reduced bond. <br />Public Works Director Davis stated that he would be glad to <br />look at the spec on the bonder for the parking area and give them <br />an opinion. <br />105 <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.