Laserfiche WebLink
r 'JUN 5 1985 <br />CHANGE <br />ORDER <br />AIA DOCUMENT k';701 <br />BOOK <br />61 rt1;E 6 <br />Dlstttl)uhun tu: <br />OwNLR Ll 111? 13/';���. <br />ARCHITLCI 11 ��� J16 <br />CC N 1 RACIOR CI 4, <br />FIELD <br />PROTECT: <br />(name, address gifford Park Tennis .Courts <br />TO (Contractor) : <br />Varsity Courts, Inc <br />1970-A Corporate Square <br />II Longwood, Florida 32750 <br />L.� <br />CHANGL ORDER NUNABER. <br />INITIATION DALE: May 9,` <br />413- <br />5 <br />ENGINEER PROJECT NO: 8413' <br />CONTRACT FOR: Gifford Park Tennis Courts <br />J,CONT RACUDATE: February 20,. 1985 <br />You are directed to make the tollowing changes In this Contract: <br />1. The Tennis Courts shall be constructed as specified <br />and according to the revised drawings, having a total <br />dimension of 120.feet (north -south) by 108 (east -west) <br />and located 20± feet west of the existing basketball/tennis <br />courts. <br />2. -The chain link fence as specified, shall be installed <br />according to the revised drawings completely enclosing <br />the Tennis Courts only and not connecting to the existing <br />Basketball/tennis Courts fence requiring approximately <br />456 feet total of chain link fence and gate and including <br />2 additional terminal or end posts. <br />3. Only one gate equal to that specified shall be installed <br />in the fence approximately midway along the southern <br />fence line according to the revised drawing <br />Approve s 9 form <br />and le al seffinionru <br />rY 9. BrandengUd <br />Not valid until signed by both the Owner and Architect. torneY <br />Signature of the Cuntractor indicates hu agreement herewith, including any adjustment in the CAntraLt um <br />Uf <br />The original (Contract Sum) was ........................... $ 27,995.00 <br />Net change by previously authorized Change Orders .................... . .............. $ -0- <br />The <br />0 -The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... $ 27, 995.00 <br />The (Contract Sum)be (M &" (decreased) (tWXbcXlgKX <br />bythis Change Order......................................................... $ 891.60 <br />The new (Contract Sum) (Ck%ojMxg(W&xpFr w) t) including this Change Order will be ... $ 27,103.40 <br />The Contract Time will be (increased) by ( 5 ) Days. <br />The Date of Substantial Completion as of the date of this Change Order therefore Is Jul 14, 1985 <br />Authorized: <br />James W. g•yi , P.F.• Vnrsity i7nurtg, Tnr Tiidian River Coimt7v---- <br />ENGINEER C°lft, <br />"r 'ate Square: (l bs 25th Street <br />18.40_25th_ Street_ -- <br />Address Ve A`%ngwood, Fl, 32750 <br />Vero Beach, F1:32960 ' <br />BY <br />00, <br />DA,I s - <br />AIA DOCUMENT G701 c I»n(,t OKLAK I',;n IU 1I10t, Ai+` <br />THE AMEKICAN INSMUIE Ut AKCNIIELIS, 1:3.4 r.tw Nk/KK Avt , h N . YOASMNA.,k)N. U \ _AAAA. <br />20 <br />Addre <br />Ver; JjBach, F1. /32960 <br />t ri----- 6151$5 — <br />I <br />6701-1978 <br />