My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/12/1985
CBCC
>
Meetings
>
1980's
>
1985
>
6/12/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:13 AM
Creation date
6/12/2015 10:28:42 AM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW SEBASTIAN ELEMENTARY SCHOOL LOCATED ON CR -512 <br />Public Works Director Jim Davis reviewed the following memo <br />dated 5/30/85: <br />TO: The Honorable Members of DATE: May 30, 1985 FILE: <br />the Board of County Camiissioners <br />THROUGH: <br />Michael Wright, <br />County Administrator <br />FROM:James W. Davis, P.E. <br />• Public Works Director <br />DESCRIPTION AND CONDITIONS <br />New Sebastian Elementary <br />SUBJECT: School Located on CR 512 <br />REFERENCES: <br />As stated in the above referenced letter from Dr. Burns to Michael Wright, <br />the County staff and School District staff have met on numerous occasions <br />to review and modify the new Sebastian Elementary School plans so that <br />adverse impacts associated with the school's construction can be mitigated. <br />The result has been a major relocation of the entrance driveway and parking <br />facilities. <br />The Public Works staff also recommends that the 100' wide railroad right-of- <br />way through the school property be dedicated for future CR 512 expansion. <br />This involves 6-7 acres of land. t <br />Since the school is being built with major access to a moderate speed <br />arterial roadway, left turn lanes and deceleration lanes are rec=ended <br />along CR 512 at the school's driveway. The School District has indicated <br />that they do not have funds for these roadway improvements. <br />ALTTFMMTIVES AND ANALYSIS <br />Dr. Burns has proposed that the School District dedicate the 100' wide <br />railroad right-of-way along CR 512 in exchange for the County constructing <br />turning lanes. The Engineering Department has estimated that the road <br />construction cost should not exceed $32,000. <br />��*,ulUl�lkll� G 1� • 11 It 1 <br />It is recommended that the County Road and Bridge Department construct left <br />turn and deceleration lanes along CR 512 in exchange for the School <br />Districts dedication of additional right-of-way along CR 512. Funding to <br />be from the Constitutional Gas Tax (5th and 6th Cent) or frau Local Option <br />Gas Tax, if adopted. <br />Director Davis pointed out that the County has need for the <br />100 feet of FEC right-of-way that fronts CR -512 and the School <br />Board has proposed a trade off. On a map of the area, he pointed <br />out the proposed direction of the right-of-way, which will <br />intersect U.S. #1 just north of Cleveland Street. <br />9 <br />BOOK 61 F' E 105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.