My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/21/1985
CBCC
>
Meetings
>
1980's
>
1985
>
8/21/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:31 AM
Creation date
6/12/2015 10:37:28 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/21/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br />Date: 8-21-85 <br />Work Authorization No. 1 for Consulting Services (Wastewater) <br />Project No. 1 , County Serial No. (Masteller & Moler <br />Associates, Inc.) <br />I. PROJECT DESCRIPTION <br />Title: Consulting Engineering services relative to modifications of <br />the Whispering Palms pumping station including removal of wet <br />well lid and superstructure; removal of pump, piping and valves; <br />removal of electrical controls/panel; extend existing wet well <br />to grade, construct new wet well cover; install new duplex pumps <br />and electrical controls/panel; install new valve chamber and <br />connect to existing force main. Budget estimate for construction <br />cost is $28,000.00. <br />II. SCOPE OF SERVICES AND LUMP SUM FEE FOR SERVICES <br />Reference is made to the "Agreement for Professional Services" <br />dated June 5, 1985 and specific Article numbers and paragraph <br />numbers which are listed hereinafter to describe the scope of <br />services included on this project: <br />A. Project Design Services per Article 4, paragraph 4a. and <br />4b. <br />B. General Services During Construction per Article 5, para- <br />graph 5a. and 5b. <br />C. Supplementary and Special Services per Article 6, paragraph <br />6c., 6d., 6e., 6f., and 6g. In addition, our services <br />shall include field surveys necessary for design and prep- <br />aration of construction plans and assistance to the County <br />in obtaining various permits and approvals for construction <br />(permit fees to be paid by the County). <br />D. Payment for Services per Article 8, paragraph 8a.(1) and <br />8a.(2), the fee for A, B, and C shall not exceed a total <br />of $3,800.00. Payment shall be per paragraph 8d. <br />APPROVED BY: <br />INDIAN RIVER COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />SUBMITTED BY: <br />MASTELLER & MOLER ASSOCIATES, INC. <br />By: �/�► C _ By <br />Don C. SCUY`lOCk, Ear H. Masteller, P.E. <br />Vice Chairman President <br />Date: August 21, 1985 <br />APPROVED AS TO FORM AND LEGAL <br />SUFFICIENCY: <br />aj,. i,— <br />Charles Vitunac <br />County Attorney <br />Date: _ " 17_ <br />18 <br />BOOK 61 FAG -E815 <br />
The URL can be used to link to this page
Your browser does not support the video tag.