My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-017
CBCC
>
Ordinances
>
2010's
>
2015
>
2015-017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 4:11:03 PM
Creation date
12/3/2015 12:29:46 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2015-017
Adopted Date
12/01/2015
Agenda Item Number
10.A.1.
Ordinance Type
Comprehensive Plan
State Filed Date
12\02\2016
Entity Name
Capital Improvements Program
Code Number
F.S. 163.177(3)(b)
Subject
Capital IMprovements Element Amend Text
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />Currently, the County operates its solid waste services, golf course facility, building division services, <br />and utility services as enterprise funds. <br />As a tool for affecting the timing and location of development, user charges may be designated to vary <br />with the quantity and location of the service provided. Thus, charges could be greater for providing <br />services further from urban areas and less for distances closer to urban areas. In this way, user <br />charges could affect the economics of development locating further away from urban areas. <br />Analysis <br />The analysis section of this element assesses the County's historic and projected revenue and <br />expenditure patterns to determine the County's fiscal ability to provide adequate capital <br />improvements. Those capital improvements have been identified in other comprehensive plan <br />elements and are needed to meet the demands of existing and future development. <br />As part of this analysis, revenue and expenditure projections are identified and analyzed, and a fiscal <br />assessment of needs (costs) versus projected available revenue is included. <br />Analysis of the Timing and Location of Capital Improvements <br />Objectives and policies from the Future Land Use Element, Potable Water Sub -Element, Sanitary <br />Sewer Sub -Element, Recreation and Open Space Element, Public School Facilities Element, and the <br />Transportation Element, as well as policies followed by the Sheriff's office and County departments <br />such as Emergency Management, Corrections, Libraries, and Solid Waste, have the most direct effect <br />on the timing and location of capital improvements. <br />Through planning for future improvements to the transportation system, the Transportation Element <br />directly affects the development potential of property. Also affecting the development potential of <br />property are the water and sewer connection requirements and the availability of parks, and public <br />school capacity. Within the Future Land Use Element (FLUE), the assignment of land use density <br />and intensity, as well as the urban service area regulations, affect the timing and location of capital <br />improvements. <br />Consistent with the FLUE and urban service area requirements in the County's comprehensive plan, <br />the County provides public facilities and services to promote compact development by emphasizing <br />infill development in urban areas and maximizing the efficiency of existing facilities and services in <br />under utilized areas. The FLUE also limits urban sprawl and ensures that adequate facilities will be <br />present to accommodate future growth. Maximizing the use of existing facilities and controlling <br />urban sprawl will contribute to a cost-effective and efficient service delivery system. <br />Community Development Department Indian River County <br />Adopted Vat • 1 , 2015, Ordinance 2015- 011 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.