Laserfiche WebLink
Attachment C — Project Narrative <br /> (lhe a formation included an this attachment was copied from the Recipient's Application for Funding Some of'Ihe ackvtty,benefiaag or <br /> budget information mrxy have changed as a result of DEO'j review of'the application,the site visit and changes in estimated costs between the time <br /> the application was submitted and when at was selected for funding These changes will be reflected an Attachments A and B.) <br /> Service Area 1—West Wabasso Phase 2—New Sewer Mains <br /> Homes in the service area currently are hooked to septic tanks. Health and safety conditions will improve with <br /> the provision of the CDBG-funded public sewer lines. The new sewer lines in West Wabasso will allow <br /> substandard septic systems to be eliminated and improve the quality of life for that community by improving <br /> property values and providing access to safe and sanitary sewer service. A complimentary benefit will be the <br /> reconstruction of streets and paving to modern standards, further adding to quality of life in the community. <br /> The project includes new sewer lines, 16 manholes, and laterals. A new lift station will also be provided south of <br /> County Road 510. ' <br /> The beneficiaries of this activity are: Very Low-Income (VLI): 73 Low-Income (LI). 10 Moderate-Income <br /> (MI) 11 Over-Income: 5 for a Total of 99 <br /> Service Area 1—West Wabasso Phase 2—New Sewer Hookups <br /> Households in the service area are currently use septic tanks. Health and safety conditions will improve with the <br /> provision of sewer hookups. Up to 45 hookups are possible, but 30 hookups are claimed for scoring purposes. <br /> Homes will be connected based on the terms of participation in the County's hookup plan,which will include <br /> making State Housing Initiative Partnership (SHIP) funds available for LMI owner-occupied units who choose <br /> to apply and meet the qualification requirements. <br /> The beneficiaries of this activity are: VLI: 22 LI: 6 MI: 0 Over: 2 for a Total of 30 <br /> Service Area 2—Gifford Flood and Drainage <br /> County residents in this service area are currently affected by poor flood and drainage conditions. Activities <br /> include improving swales and constructing new culverts in the East Gifford area between 28th Avenue to the <br /> west, Old Dixie Hwy to the east,43rd Street to the north and 42nd Street to the south encompassing 42nd Place, <br /> 27th Avenue,26th Avenue,25th Avenue, 24th Ct. and 24th Avenue. Re-graded swales and new culvert pipes <br /> will convey stormwater flows to the existing retention pond located south of 42nd Street. <br /> The beneficiaries of this activity are: VLI: 82 LI: 3 MI: 8 Over: 6 for a Total of 99 <br /> *Please also note that the proposed work on 41St Street reflected on pages C-3, C-4,C-11 and C-12 of <br /> construction drawings will be addressed with non-CDBG funds. <br /> *Please also note the Gifford flood and drainage improvements that includes proposed swales located on the <br /> north side of 43rd Street between 25th Avenue on the west and 24,h Court on the east do not have surveyed <br /> beneficiaries calculated in the CDBG project area as this work will be addressed with non-CDBG funds. <br /> Local Funds Local Funds <br /> Activity CDBG Funds Scored for Not Scored for Total Project <br /> Points Points Cost <br /> New Sewer Mains $720,000 $0 $227,000 $947,000 <br /> New Sewer Hookups $0 $50,000 $0 $50,000 <br /> New Flood and Drainage $30,000 $0 $140,000 $170,000 <br /> Grant Administration so $0 $50,000 $50,000 <br /> Engineering and Inspection $0 $0 $80,000 $80,000 <br /> Total CDBG Budget $750,000 $50,000 $497,000 $1,297,000 <br /> Rev. 09/03/2015 18 <br />