Deliverable B: One electronic copy of the 2015 Post -Construction Physical Monitoring Report. <br />(CBI WO 9 — Tasks 1 through 6). <br />Total Cost: $35,057 (DEPARTMENT Cost: $17,528.50). <br />Due Date: January 31, 2018. <br />Deliverable C: 2015 Rectified Aerials as required by DEPARTMENT Joint Coastal Permit 0.285993, modification <br />0285993 -008 -JN, Special Permit Conditions 53 and 56(c). (CBI WO No. 9). <br />Total Cost: $15,805 (DEPARTMENT Cost: $7,902.50). <br />Due Date: January 31, 2018. <br />NOTE: The deliverable due dates established in this Grant Work Plan indicate the time by which a <br />deliverable is received and approved for cost sharing. The dates do not necessarily correspond with permit <br />required due dates. The Local Sponsor must meet the terms of the permit for compliance. <br />All Tasks are Contractual Services. <br />DEP Agreement No. 14IR2, Amendment No. 2, Attachment A, Page 6 of 6 <br />