My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01310 <br />CONSTRUCTION SCHEDULES <br />1.1 GENERAL REQUIREMENTS <br />A. No partial payments shall be approved by the ENGINEER until there is an <br />approved construction progress schedule on hand. <br />B. Designate an authorized representative who shall be responsible for <br />development and maintenance of the schedule and of all progress and <br />payment reports. This representative shall have direct project control and <br />complete authority to act on behalf of the CONTRACTOR in fulfilling the <br />commitments of the CONTRACTOR's schedules. <br />1.2 REVISIONS TO THE CONSTRUCTION SCHEDULES <br />When the ENGINEER requires the CONTRACTOR to submit revised (updated) <br />progress schedules on a monthly basis the CONTRACTOR shall: <br />A. Indicate the progress of each activity to the date of submission. <br />B. Show changes occurring since the previous submission listing: <br />1. Major changes in scope. <br />2. Activities modified since the previous submission. <br />3. Revised projections of progress and completion. <br />4. Other identifiable changes. <br />C. Provide a narrative report as needed to define: <br />1. Problem areas, anticipated delays, and the impact on the schedule. <br />2. Corrective action recommended and its effect. <br />3. The effect of changes on schedules of other prime contractors. <br />1.3 SUBMISSION OF THE CONSTRUCTION SCHEDULES <br />On or before the tenth day after the effective date of the Agreement, submit the <br />initial schedules to the ENGINEER. The ENGINEER will review the schedules <br />and return a review copy to the CONTRACTOR within 21 days after receipt. If <br />required by the ENGINEER, resubmit revised schedules on or before the <br />seventh day after receipt of the review copy. If required by the ENGINEER, <br />submit revised monthly progress schedules with that month's application for <br />payment. <br />01310-1 01310 Construction Schedule <br />F•\Public Works\ENGINEERING DIVISION PROJECTS\1304-CR 512 Resurf (SCOP)_125th Ave to I-95\Admim\bid <br />documents\Master Contract Documents\01310 - Construction Schedule.doc <br />