Laserfiche WebLink
1.4_. DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br />-A. After receiving approval by the ENGINEER, distribute copies of the <br />approved initial schedule and all reviewed revisions (updated) to: <br />1. Job site file. <br />2. Subcontractors. <br />3. Other concerned parties. <br />OWNER (two copies). <br />5. ENGINEER <br />B. In the cover letter, instruct recipients to report promptly to the <br />CONTRACTOR, in writing, any problems anticipated by the projections <br />shown in the schedules. <br />+ + END OF SECTION + + <br />01310-2 01310 Construction Schedule <br />F•\Public Works\ENGINEERING DIVISION PROJECTS \1304 -CR 512 Resurf (SCOP)_125th Ave to I-95\Admim\bid <br />documents\Master Contract Documents\01310 - Construction Schedule.doc <br />