My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION. 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />structures provide. If CONTRACTOR damages an underground structure, <br />restore it to original condition at CONTRACTOR's expense. <br />7. Necessary changes in the location of the Work may be made by <br />ENGINEER, to avoid unanticipated underground structures. <br />8. If permanent relocation of an underground structure or other subsurface <br />facility is required and is not otherwise provided for in the Contract <br />Documents, ENGINEER will direct CONTRACTOR in writing to perform the <br />Work, which shall be paid for under the provisions of Article 11 of the <br />General Conditions. <br />B. Surface Structures: <br />1. Surface structures are defined as structures or facilities above the ground <br />surface. Included with such structures are their foundations and any <br />extension below the surface. Surface structures include, but are not limited <br />to, buildings, tanks, walls, bridges, roads, dams, channels, open drainage, <br />piping, poles, wires, posts, signs, markers, curbs, walks and all other facil- <br />ities that are visible above the ground surface. <br />C. Protection of Underground and Surface Structures: <br />1. Sustain in their places and protect from direct or indirect injury, all <br />underground and surface structures located within or adjacent to the limits <br />of the Work. Such sustaining and supporting shall be done carefully, and <br />as required by the party owning or controlling such structure. Before <br />proceeding with the work of sustaining and supporting such structure, <br />satisfy the ENGINEER that the methods and procedures to be used have <br />been approved by the party owning same. <br />2. Assume all risks attending the presence or proximity of all underground and <br />surface structures within or adjacent to the limits of the Work. <br />CONTRACTOR shall be responsible for all damage and expense for direct <br />or indirect injury caused by its Work to any structure. CONTRACTOR shall <br />repair immediately all damage caused by his work, to the satisfaction of the <br />OWNER of the damaged structure. <br />D. All other existing surface facilities, including but not limited to, guard rails, posts, <br />guard cables, signs, poles, markers, and curbs which are temporarily removed to <br />facilitate installation of the Work shall be replaced and restored to their original <br />condition at CONTRACTOR'S expense. <br />1.6 DAMAGE TO EXISTING STRUCTURES AND UTILITIES <br />A. The CONTRACTOR shall be responsible for and make good all damage to <br />pavement beyond the limits of this Contract, buildings, telephone or other <br />cables, water pipes, sanitary pipes, or other structures which may be <br />encountered, whether or not shown on the Drawings. <br />01541-4 F•\Public Works\ENGINEERING DIVISION <br />PROJECTS\1304-CR 512 Resurf (SCOP)_125th Ave to I-95\Admim\bid documents\Master Contract Documents\01541 - Protection of <br />Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.