My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK -AND PROPERTY <br />Information shown on the Drawings as to the location of existing utilities has <br />been prepared from the most reliable data available to the Engineer. This <br />information is not guaranteed, however, and it shall be this CONTRACTOR's <br />responsibility to determine the location, character and depth of any existing <br />utilities. He shall assist the utility companies, by every means possible to <br />determine said locations. Extreme caution shall be exercised to eliminate any <br />possibility of any damage to utilities resulting from his activities. <br />1.7 ADJUSTMENTS OF UTILITY CASTINGS, COVERS AND BOXES <br />A. All existing utility castings, including valve boxes, junction boxes, manholes, pull <br />boxes, inlets and similar structures in the areas of construction that are to <br />remain in service shall be adjusted by the CONTRACTOR to bring them flush <br />with the surface of the finished work. <br />B. The CONTRACTOR shall coordinate the utilities to ensure proper construction <br />sequencing. CONTRACTOR shall make available survey reference markers to <br />the various utility companies. <br />+ + END OF SECTION + + <br />01541-5 \Public Works\ENGINEERING DIVISION <br />PROJECTS\1304-CR 512 Resurf (SCOP)_125th Ave to I-95\Admim\bid documents\Master Contract Documents\01541 - Protection of <br />Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.