My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
coordinate with county representative prior to any subsoil excavation. <br />D. Embankment - General Requirements for Embankment Materials: The following is <br />added after the first paragraph of Subarticle 120-7.2: <br />Roadway Design Standard Index No. 505, Embankment Utilization Details is modified <br />by the addition of the following: <br />Any stratum or stockpile or soil which contains obvious pockets of highly organic <br />material may be designated as muck or unsuitable for construction of subgrade by the <br />Owner. <br />Backfill material containing more than 2.0% by weight of organic material, as" <br />determined by FM 1-T 267 and by averaging the test results for three randomly <br />selected samples from each stratum or stockpile of a particular material, shall not be <br />used in construction of the reinforced volume. If an individual test value of the three <br />samples exceeds 3.0%, the stratum or stockpile will not be suitable for construction of <br />the reinforced volume. <br />No A-8 material permitted in embankment. <br />E. Payment shall be made under: <br />Bid Item No. 120-7 — Regrade and Compact Outside Shoulder Area"(as needed) — <br />Per Square Yard <br />SECTION — 285 — OPTIONAL BASE COURSE <br />Sub Article 285-4 is modified by the addition of the following: <br />Base material, thickness and requirements are described in the construction plans. <br />Only one type of alternate base material shall be used. No additional payment will be <br />made for base thickness in excess of the specified thickness <br />3. B. Payment shall be made under: <br />Bid Item No. 285-706 — Optional Base Group 06 (Cemented Coquina Shell Base <br />Group 6) (8") Two Lifts - Per Square Yard <br />SECTION — 327 - MILLING OF EXISTING ASPHALTIC PAVEMENT <br />The work specified in this item shall conform to Section 327 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction (2015). <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 327-70-6 — Milling Existing Asphalt Pavement (1 1/2" Avg.) — Per <br />SquareYard <br />01025-25 Technical Specifications <br />F.\Public Works\ENGINEERING DIVISION PROJECTS\1304-CR 512 Resurf (SCOP)_125th Ave to 1-951Admim\bid documentsWlaster <br />Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.