Laserfiche WebLink
SECTION — 334 - SUPERPAVE ASPHALT CONCRETE <br />The work specified in this item shall conform to Section 334 of the Florida <br />Department of Transportation Standard Specifications for Road and Bridge <br />Construction (2015). <br />Sub article 334-8.1 through 334-8.3 — Basis of Payment shall be deleted in its <br />entirety. <br />Sub article 334-8.4 — Payment shall be amended as follows: <br />Bid Item No. 334-1-13 — Superpave Asphalt Concrete —SP 9.5 — Traffic C (2" Thick, <br />1 lift) Per Square Yard. <br />SECTION - 570 — PERFORMANCE TURF <br />The work specified in this item shall conform to Section 570 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction (2015). <br />A. Description: Sod for the project shall be of the variety that is common to the area and <br />of a variety approved by the Engineer. This work shall also include mowing, to be <br />mowed at maximum 6" height with a mulching mower. <br />B. Work Included: Scope of Work: The work specified in this section consists of the <br />establishing of a stand of grass, within the project, right-of-way, easements, and other <br />areas indicated on the Drawings, by furnishing and placing grass sod. Also included <br />are fertilizing, watering and maintenance as required to assure a healthy stand of <br />grass.Two applications of fertilizer will be required with the initial application being <br />fertilizer and the second application being "weed and feed". <br />C. Guarantee: All sodded areas shall be guaranteed for one year after date of final <br />acceptance. <br />Replacement of Defective Sod: Any dead sod or sod showing (less than 95% of a <br />square) indication of probable non survival or lack of health and vigor, or which do not <br />exhibit the characteristics to meet specifications, shall be replaced within two weeks of <br />notice from Owner or Engineer. All replacement sod shall be furnished/installed at no <br />additional cost to the Owner and shall be guaranteed for three months. All replacement <br />shall meet original specifications. <br />The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br />guarantee period and such guarantee shall be extended until notification is received. <br />At the end of the guarantee period, all sod that is dead or in unsatisfactory growth shall <br />be replaced within two weeks. <br />D. •Fertilizer: Commercial fertilizers shall comply with the Indian River. County Fertilizer <br />Ordinance 2013-012 and Supplement Ordinance 2013-014 (see Appendix A). <br />01025-26 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1304-CR 512 Resurf (SCOP)_125th Ave to I-95\Admim\bid documents\Master <br />Contract Documents\Technical Specifications.doc <br />