Laserfiche WebLink
QUESTIONS AND RESPONSES: <br />QUESTION NO. 1 <br />Do you have to be FDOT qualified to bid? <br />ANSWER NO. 1 <br />In the Contract Documents for the project, Section 00200 — Instructions to Bidders; Article 3 - <br />Qualifications of Bidders; and Section 00456 - Qualifications Questionnaire lists the requirements that <br />must be met for a qualified bidder. <br />QUESTION NO. 2 <br />Who is going to take the ownership of the milled material? <br />ANSWER NO. 2 <br />Per section 01009, Special Provisions, 1.1 General Conditions, paragraph (C), the County will take <br />ownership of the milled material. <br />QUESTION NO. 3 <br />If IRC is going to take the ownership, please specify the location of where the material is to be hauled to? <br />ANSWER NO. 3 <br />Per section 01009, Special Provisions, 1.1 General Conditions, paragraph (C), the County will take <br />ownership of the milled material and the material shall be delivered, to 4550 41st Street, Vero Beach <br />Florida at the Contractors Expense. <br />QUESTION NO. 4 <br />What will be the responsibility of the contractor at the dump site? <br />ANSWER NO. 4 <br />The contractor will not have any responsibilities at the dump site other than coordinating with the County <br />as to where on the dump site the materials shall be delivered. <br />Page 2 of 4 <br />F•\Public Works\ENGINEERING DIVISION PROJECTS \1304 -CR 512 Resurf(SCOP)_125th Ave to 1-95\Admim\bid documents\Addendum 9l\Addendum No. 1 1304 CR -512 092915 doc <br />