My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-221A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-221A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 12:56:59 PM
Creation date
12/9/2015 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/17/2015
Control Number
2015-221A
Agenda Item Number
8.G.
Entity Name
Ranger Construction
Subject
Resurface CR 512 from 125th Ave. to I-95
Contracts and Specifications
Area
125th Ave.to I-95
Project Number
1304
Bid Number
2016003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUESTION NO. 5 <br />Is silt fencing going to be required for the entire length of the project? <br />ANSWER NO. 5 <br />Per Division 2 - Technical Provisions, Section 104.-- Prevention, Control, and Abatement of Erosion and <br />Water Pollution, Part 1— General, Subsection 1.5, it specifically states that before beginning construction, <br />the contactor shall submit to Indian River County for review and approval, a Stormwater Pollution <br />Prevention Plan (SWPPP), prepared by a certified erosion control subcontractor. It is the responsibility of <br />the Contractor to ensure that the SWPPP meets the requirements for erosion control, which may include <br />silt fence along the entire length of the project to meet requirements of County, State, and Federal <br />erosion protection regulations. Additionally, the Contractor is responsible for obtaining an FDEP-NPDES <br />permit as required in subsection 1.2. <br />QUESTION NO. 6 <br />Are as -built drawings going to be required of the finished surface? <br />ANSWER NO. 6 <br />Yes. As -built drawing will be required per Division 2 - Technical Provisions, Section 101 — Mobilization, <br />subsection Record/As-built Drawings. <br />Page 3 of 4 <br />F*\Public Works\ENGINEERING DIVISION PROJECTS\1304-CR 512 Resurf (SCOP)_ 125th Ave to I-95\Admim\bid documents\Addendum °1\Addendum No. 1 1304 CR -512 092915.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.