My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-244
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:25:57 AM
Creation date
12/17/2015 11:09:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/15/2015
Control Number
2015-243
Agenda Item Number
8.P.
Entity Name
Carter and Associates
Subject
Work Order No. 2 Wabasso Bridges Hanging
Reuse Water Main Crossing Inspection
Area
Wabasso Bridge
Project Number
15-54E
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Any additional services requested by the Owner, but not included in this Project Scope, may be <br />provided at our hourly rates, a copy of which is attached. Reimbursable expenses, such as permit <br />fees, express mail, mileage, reproduction, etc., will be billed at cost, except for the manufactured <br />inspection platform and tapping services which will be cost plus 15 and 10 percent (to cover design <br />services and administrative costs). The scaffold design sheets as well as costs for the scaffold <br />(which has been bid by CAI), scaffold platforms and the tapping services are attached in this <br />Proposal for your review. <br />CAI sincerely thanks the County for giving us the oppoliunity to submit a Proposal for our <br />services. We look forward to working with you on this project. Should you have any questions or <br />need additional information, please do not hesitate to contact me at our office. <br />Very Truly Yours, <br />CARTER ASSOCIATES, INC. <br />47 <br />Steve Snoberger, P.E. <br />Project Manager <br />Patrick Walther, P.E. <br />Principal <br />cc: Patrick Walther, P.E. - Principal, CAI <br />Terry Southard - IRCDUS, Utility Operations Manager <br />Page 2. of 14 <br />N:\SDS\I5-54. E (I.RCUD Wabasso Causeway)\Proposal\Rev Proposal doc <br />Seng alit <br />�' '` Sill= al <br />
The URL can be used to link to this page
Your browser does not support the video tag.