My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/03/2015
CBCC
>
Meetings
>
2010's
>
2015
>
10/03/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 12:56:02 PM
Creation date
12/29/2015 12:55:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/03/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Department of Utilities <br /> LABOR AND MATERIALS COST ESTIMATE FROM LABOR CONTRACTOR'S BID ITEM LIST <br /> LABOR CONTRACTOR-BLUE GOOSE CONSTRUCTION <br /> Project: Loop Completions f <br /> Date: October 5,2015 <br /> LABOR COST MATERIALS <br /> Bid JBid Item Estimated Unit of Labor Unit Total Labor Material Unit I Total Material <br /> Item No.I Descriptio uantit Measure Price Price Price Price <br /> LABOR COST MATERIALS <br /> BidBid Item Estimated Unit of Labor Unit Total Labor Material Unit Total Material <br /> Item No. Descri tion unntity Measure Price Price Price Price <br /> C.20th Avenue s/o 19th Place SW-WM Loop <br /> Connection <br /> Ole Install 8"PVC Water Main 60.0 LF $8.00 $480.00 S972 $583.20 _j <br /> 07b Install 8"HDPE Directional Drill including 100 S4985 $12.43 II <br /> Fusion of Pi and MJ Adapters LF S4,985.00 S1,243.00-1 <br /> J <br /> 16a Install SS Wet Tap Assemb.w/Gate Valve 6"X 2 $900.00 $1,500.00 <br /> 6"and Ta Main EA. $1.800.00 $3,000.00 <br /> 23 Test Holes/Potholes 15 EA. $250.00 S3,750.00 ! <br /> 29a Fill Pressure Test Chlorinate Flush6"Water M 160 LF $1.50 $240.00 $100.00 $100.00 <br /> ns a amp e m pe oun a a�,mumove "'- <br /> 30b After FDEP Clearance 2 EA. S27500 $550.00 $400.00 $800.00 <br /> 30c Take Bacterial Sample/Deliver to Lab for Testing 4 EA. $15000 $600.00 <br /> 09 Install Mechanical Restrained Joint DI Fittings 0.50 TON $4,100.00 $2,050.00 $4,100.00 $2,050.00 <br /> 86a Lawn Restoration To soil&Sod St.Augustine) 400 SY $2.25 $900.00 $1.50 $600.00 <br /> Subtotal Subtotal Labor and Materials _ _ $15.355.00 $8.376.20 <br /> 91 IMobilization,Demobilization MOT 1 10% $1,535.50 <br /> Subtotal Subtotal Water System Labor, Mob.,Demob., <br /> MOT and Materials $16,890.50 $8,376.20 <br /> IRCDUS Contingency Account 1 10% $1,689.05 $837.62 <br /> Subtotals for Labor and Materials S18,579.5 $9,213.82 <br /> TOTAL S27,793.37 <br /> Totals for Labor and Materials(Separately)for Three <br /> Locations $101,954.60 $41,895.92 <br /> TOTAL Project Labor and Materials for Three Locations $143,850.52 <br /> O <br />
The URL can be used to link to this page
Your browser does not support the video tag.