My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/6/1985
CBCC
>
Meetings
>
1980's
>
1985
>
11/6/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:31 AM
Creation date
6/12/2015 11:14:47 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/06/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br />Date: 11-6-85 <br />Work Authorization No. 2 for Consulting Services <br />Project No. 2 (County) (Sippel, Masteller, Lorenz & , <br />Hoover, Inc.) <br />I. PROJECT DESCRIPTION <br />Title: Consulting Engineering services relative to the Second (2nd) Street <br />8" diameter water main extension west from a point approximately <br />1150 ' west of Old Dixie Highway to Twentieth (20th) Avenue con- <br />sisting of approximately 4,850 feet with valves, hydrants, and <br />appurtenances. Budget estimate for construction cost is $115,500.00. <br />II. SCOPE OF SERVICES AND LUMP SUM FEE FOR SERVICES <br />Reference is made to the "Agreement for Professional Services" dated <br />April 24, 1985 and specific Article numbers and paragraph numbers <br />which are listed hereinafter to describe the scope of services in- <br />cluded on this project: <br />A. Project Design Services per Article 4, paragraph 4a. and 4b. <br />B. General Services During Construction per Articl'e 5, paragraph <br />5a. and 5b. <br />C. Supplementary and Special Services per Article 6, paragraph 6c., <br />6d., 6e., 6f., and 6g. In addition, our services shall include <br />field surveys necessary for design and preparation of construc- <br />tion plans and assistance to the County in obtaining various per- <br />mits and approvals for construction (permit fees to be paid by <br />the County). <br />D. Payment for Services per Article 8, paragraph 8b., the lump sum <br />fee for A, B and C above is $9,700.00. Payment shall be per <br />paragraph 8d. <br />APPROVED BY: SUBMITTED BY: <br />INDIAN RIVER COUNTY SIPPEL, MASTELLER, LORENZ & HOOVER, INC. BOA�OF C UNTY COMMISSIONERS <br />Y BY. <br />tr ck B. Lyons, Earl H. Masteller, P.E. <br />Chairman Executive Vice President <br />Date 11-6-85 <br />APPROVED AS TO FORM AND LEGAL <br />SUFFICIENCY: <br />Charles Vitunac <br />County Attorney <br />53 <br />Date October 14, 1985 <br />6`79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.