My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/6/1985
CBCC
>
Meetings
>
1980's
>
1985
>
11/6/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:31 AM
Creation date
6/12/2015 11:14:47 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/06/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r- NOV s 1985 <br />WATER EXTENSION - 23RD ST. WEST OF KINGS HIGHWAY <br />BOOK 62 FAGS 606 <br />The Board reviewed the following staff memo: <br />_ TO: BOARD OF COUNTY <br />COMMISSIONERS <br />THRU: TERRANCE G. PINT 4 <br />FROM: JEFFREY K. BARTON <br />DESCRIPTION AND CONDITIONS <br />DATE: OCTOBER 30, 1985 <br />SUBJECT: WATER EXTENSION 23RD <br />STREET WEST OF KINGS <br />HIGHWAY <br />The Route 60 sewer project calls for construction of a gravity sewer line <br />along 23rd Street west from Kings Highway. This project will cause the <br />road to be replaced upon completion of the project. Rather than replace <br />the road again, when water is constructed on 23rd Street, Staff recommends <br />that a change order to the contract for water construction on 82nd Avenue <br />and 8th Street be amended to provide the necessary construction on 23rd <br />Street. The change order would provide the County utilities with a known <br />unit price for this expansion. Attached are letters from our engineers <br />outlining the estimated costs and engineering services for this change <br />order. The estimated cost of $31,834.00 could be recovered by the impact <br />fees generated by the thirty-six residents along 23rd Street in Riviera <br />Estates. <br />RECOMMENDATION <br />Staff recommends approval of the 23rd Street water projects and would <br />request the Board of County Commissioners to authorize our engineers, <br />Sipple, Masteller, Lorenz & Hoover, Inc. to design the 23rd Street water <br />expansion and draw the change order to the 82nd Avenue and 8th Street <br />project to complete the work. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Bowman, the Board unanimously (4-0) <br />approved the 23rd Street water projects, and <br />authorized Engineers Sippel, Masteller, Lorenz & <br />Hoover, Inc., to design the 23rd Street water <br />expansion and draw the change order to the <br />82nd Ave. and 8th St. project necessary to com- <br />plete the work. <br />54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.