Laserfiche WebLink
INDIAN RIVER COUNTY <br />Date: 11-6-85 <br />Work Authorization No. 3 _ for Consulting Services <br />Project No. 3 (County) (Sippel, Masteller, Lorenz & <br />Hoover, Inc.) <br />I. PROJECT DESCRIPTION <br />Title: Consulting Engineering services relative to the 8" diameter water <br />main extension west from the intersection of Kings Highway and <br />23rd Street (Poinciana Street) consisting of approximately <br />1315 feet with valves, hydrants, and appurtenances. Budget <br />estimate for construction cost is $ 32,000.00. <br />II. SCOPE OF SERVICES AND LUMP SUM FEE FOR SERVICES <br />Reference is made to the "Agreement for Professional Services" dated <br />April 24, 1985 and specific Article numbers and paragraph numbers <br />which are listed hereinafter to describe the scope of services in- <br />cluded on this project: <br />A. Project Design Services per Article 4, paragraph 4a. and 4b. <br />B. General Services During Construction __ger Article 5, paragraph <br />5a. and 5b. <br />C. Supplementary and Special Services per Article 6, paragraph 6c., <br />6d., 6e., 6f., and 6g. In addition, our services shall include <br />field surveys necessary for design and preparation of construc- <br />tion plans and assistance to the County in obtaining various per- <br />mits and approvals for construction (permit fees to be paid by <br />the County). <br />D. Payment for Services per Article 8, paragraph 8b., the lump sum <br />fee for A, B and C above is $ 2,880.00. Payment shall be per <br />paragraph 8d. <br />`APPROVED BY: <br />INDIAN ER COUNTY <br />BOA OF D UNTY COMMISSIONERS <br />Date <br />i'atMck B. Lyons <br />Chairman <br />11-6-85 <br />APPROVED AS TO FORM AND LEGAL <br />SUFFICIENCY: <br />Charles Vitunac <br />County Attorney <br />55 <br />SUBMITTED BY: <br />SIPPEL, MASTELLER, LORENZ & HOOVER, INC. <br />ByJ nnA. <br />Earl H. Masteller, P.E. <br />Executive Vice President <br />Date October 17, 1985 <br />N,OV61985 BO2 PACE 681 <br />