My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/13/1985
CBCC
>
Meetings
>
1980's
>
1985
>
11/13/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:31 AM
Creation date
6/12/2015 11:15:32 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/13/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK B2 PA.r,E.724 <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Bowman, the Board unanimously <br />awarded the bid for modifications to Whispering <br />Palms Pumping Station in the amount of $25,500 to <br />the low bidder, Ted Myers Contracting Co., as <br />recommended by staff. <br />1. Award of Bid - Painting 8 Repair- Mid -Florida Water <br />Storage Tank <br />The Board reviewed the following memo dated 11/4/85: <br />TO: BOARD OF COUNTY COMMISSIONERS DATE: NOVEMBER 4, 1985 <br />THRU: TERRANCE G. PINTO, 3,fZECTOR SUBJECT: AWARD OF BID FOR <br />UTILITY SERVICES PAINTING AND REPAIR OF <br />150,000 GALLON ELEVATED <br />WATER STORAGE TANK (MID - <br />FLORIDA TANK) <br />FROM: JEFFREY K. BARTON, ASSISTANTQ <br />DIRECTOR, UTILITY SERVICES *tL <br />DESCRIPTION AND CONDITIONS <br />On October 24, 1985, bids were opened for the painting and repair of the <br />150,000 gallon elevated water storage tank (Mid -Florida Tank). This is the <br />second time this job has gone to bid. The first time it went to bid there <br />was only one bid received; that bid was approximately $45,000.00. <br />The attached letter from the engineer give a summary of the current bid and <br />recommends award of the bid to Hi -Line Contractors in the amount of <br />$39,978.00. This bid from Hi -Line Contractors was lower than the <br />engineer's estimate. <br />RECOMMENDATION <br />Staff recommends approval of the bid by Hi -Line Contractors in the amount <br />of $39,978.00, as outlined by our engineer. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.