My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/11/1985
CBCC
>
Meetings
>
1980's
>
1985
>
12/11/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:32 AM
Creation date
6/12/2015 11:20:10 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/11/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'7 <br />DEC 111985 BOOK AE <br />DESCRIPTION AND CONDITIONS <br />At their October 24, 1985 meeting, the Planning and Zoning <br />Commission considered a major site plan application submitted <br />by Marvin Penalba. The development plan proposed the <br />construction of a two-story retail sales/ professional office <br />building on the east side of U.S. Highway #1, between 81st <br />Street on the south and 81st Place on the north. The .88 acre <br />site is within the C -1A, Restricted Commercial District and the <br />U.S. Highway #1/C.R. 510 Commercial/Industrial Node. <br />Several aspects of the site plan presented for approval, <br />specifically access and right-of-way improvements, were in <br />direct conflict with the Site Plan Ordinance. Due to that <br />fact, the Planning staff recommended that the Planning and <br />Zoning Commission instruct Mr. Penalba to submit a revised plan <br />to the Technical Review Committee that contained revisions and <br />agreements to bring the plan into conformance. The Commission <br />concurred with staff's recommendation, and it is that decision <br />to concur that Mr. Penalba is appealing to the County <br />Commission. <br />ANALYSIS <br />The subject property has frontage on U.S. #1, 81st Street, and <br />81st Place, the latter two being unpaved local roads. The site <br />plan depicts the paving of 81st Place from U.S. #1 to the east <br />property line and two points of access off of 81st Place. <br />Based upon its depiction on the site plan, the paving will be <br />completed prior to the issuance of a certificate of occupancy. <br />One of the revisions that the Planning and Zoning Commission <br />instructed the applicant to make was to close the existing U.S. <br />#1 curb cut and access the site from one or both of the local <br />roads. It is a requirement of the Site Plan Ordinance that <br />sites located at intersections shall access onto the roadway <br />having the lower functional classification. The Planning and <br />Zoning Commission was aware that it was a retail sales/profes- <br />sional office facility that was being proposed; however, the <br />members believed lack of a direct access onto U.S. #1 would not <br />be a hindrance to customer attraction due to the adjacent 81st <br />Street and 81st Place curb cuts. <br />A second requirement of the Site Plan Ordinance that Mr. <br />Penalba was instructed to incorporate into a revised site plan <br />was right-of-way dedication. 81st Street, as a local road, has <br />a minimum required right-of-way width of 60 feet. As only 40 <br />feet exists, the applicant was informed he would be required to <br />dedicate the southern 10 feet of the site to the County. The <br />ordinance clearly states that land lying within a proposed <br />development which is necessary to widen or extend a roadway <br />shall be dedicated prior to release of the approved site plan. <br />In addition, the applicant was informed he would be required to <br />escrow 371% of the cost of paving his 81st Street frontage (82 <br />feet), a recommendation of the Technical Review Committee that <br />has been consistently upheld by the Planning and Zoning <br />Commission. In requiring the dedication and the escrowing of <br />funds, the Planning and Zoning Commission considered the fact <br />that there are undeveloped parcels to the east which will <br />eventually be accessed via 81st Street. <br />28 <br />a � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.