My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/11/1985
CBCC
>
Meetings
>
1980's
>
1985
>
12/11/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:32 AM
Creation date
6/12/2015 11:20:10 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/11/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ® r <br />The Board reviewed the following memo dated 9111185: <br />TO: THE HONORABLE M`C0�iIISSIONERS OF Tim <br />BOARD OF COUNTY O <br />THROUGH: <br />COUNTYC�gTRATOR <br />jAMES W. DAVIS, P.E. <br />PUBLIC Tn10RK•S DIRECTOR <br />FRO%aM,TZ A. TERRY, <br />CHIEF, ROAD DESIGN SECTION <br />DATE: September 11, 1985 <br />FILE: <br />PUBLIC HEARING TO CONSIDER <br />RESOLUTION PROVIDING FOR THE <br />PAVING OF 9TH COURT BMWEN 2W. <br />SUBJECT: � AND So. RUIEF <br />13TH AVENUE BErMW 1ST ST"T <br />TO 2ND STREET; 15TH AVENOE <br />BET1 1ST STREET SOUTHWEST TO <br />2ND STREET; 11TH LANE SOUTHWEST <br />1245' WEST OF OLD DIXIE <br />REFERENCES: <br />DE�gIpnON AM �ITIONS <br />Petitions ve been received property <br />owners of the following streets: <br />t and South Relief Canal (Preliminary Cost <br />1) g Court between 2nd Scree <br />$, ,595.90, 69% consent) 1,447.40 front footage; <br />2) <br />13th Avenue between 1st Street S.W. and 2nd footage; Street (Preliminary Cost <br />$33,850.30, 78% consent) 2463.39 ro <br />nt 15th Avenue between 1st Street S.W.t and 22 g ,Street (Preliminary Cost <br />3) (Preliminary nary Cost <br />$33,850.30, 71% consent)St2'of Old Dixie Highway (pre-_ <br />4) 11th Lane S.W. 1245' <br />$32,689.02, 67% consent) 2308.76 front footage. <br />for the paving and drainage <br />Preliminary assessment rolls have been <br />prepared is approximately <br />improvements. The total costs of these Projects fram other roads is <br />There is apprM mately $97,718.60 (as ads w Paved) in the <br />$119,985.52. Account these roads will be <br />replenished to the Petition 'awing count No. 703-214-541-35.39. <br />n84/85 budget for Petition =awing, <br />advertisement of the='ublic Hearing and notifications to the propertyAlso, <br />owners has been Performed. <br />FILE COP -Yl. gBATION AND FUNDING it is <br />Provided at the Public Hearing, <br />After consideration of the -Ublic input <br />recc�ended that motions be made to: is <br />-viding for the paving and drainage improvemen <br />1) Adopt resolutions, P--sub� the terms outlined in the <br />for each petition pat='?g PrOJeo 11 be 1% over the Prime <br />Resolutions. The apg-cable interest rate a roved.- .. <br />Rate at the time the -- assessment roll is ag an changes made as a <br />Approve preliminary assessment rolls including Y <br />2) APP <br />result of the Public �_e petition Paving Account to fund this work. <br />3j Allocate $119,985.52 t be notified to schedule construction, <br />A 4) The Road and Bridge or when funding is available. <br />probably in late 198= or wh <br />39 <br />BOOK <br />0'2 f4,GE 97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.