DEC 19 1995 <br />PAGE <br />502. <br />Review existing injection well operations. <br />503. <br />Determine number and size'of well(s) required. ` <br />504. <br />Develop preliminary costs of construction of test <br />804. <br />and/or production well(s). <br />505. <br />Incorporate findings into conceptual feasibility <br />TASK 900 Progress Reports: <br />report. <br />TASK 600 Evaluate Storage Alternative: <br />601. <br />Determine storage volume required. <br />602. <br />Analyze alternative methods of storage. <br />603. <br />Develop preliminary costs of construction and <br />904. <br />operation. <br />604. <br />Incorporate findings into conceptual feasibility <br />905. <br />report. <br />TASK 700 Evaluate Infiltration Basins: <br />701.' <br />Analyze existing percolation test data. <br />702. <br />Determine groundwater table conditions. <br />703. <br />Determine application rates and design <br />requirements. <br />704. <br />Develop preliminary costs of construction. <br />705. <br />Incorporate findings into conceptual feasibility <br />report. <br />TASK 800 Prepare Conceptual Design Report: <br />801. <br />Discuss wastewater treatment levels. <br />802. <br />Compare effluent alternatives. <br />803. <br />Summarize financial, institutional, environmental, <br />permitting and public acceptance considerations. <br />804. <br />Recommend plan including construction costs and <br />operating costs for program. <br />TASK 900 Progress Reports: <br />901. <br />Attend up to 2 meetings with Owner. <br />902. <br />Attend up to 2 meetings with FDER and other <br />agencies. <br />903. <br />Conduct technical review committee (TRC) meeting. <br />904. <br />Conduct weekly discussions by telephone to review <br />progress. <br />905. <br />Submit three copies each of draft and final report. <br />10 <br />- M M <br />