My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/1985
CBCC
>
Meetings
>
1980's
>
1985
>
12/18/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:32 AM
Creation date
6/12/2015 11:22:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/18/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />TASK 100 Review Background Information <br />101. Review existing studies related to wastewater <br />treatment plant effluent disposal as required, <br />including Indian River County Area -Wide Wastewater <br />Master Plan. <br />102. Review Florida Department of Environmental <br />Regulation (FDER) and St. John's Water Management <br />District effluent disposal regulations. <br />103. Review existing permits for the wastewater <br />treatment plant. <br />104. Review design and construction of existing effluent <br />disposal system (percolation pond). <br />TASK 200 Project Wastewater Flows and Loadings: <br />201. Determine population projections for sewer service <br />area based on existing wastewater master plan <br />referenced in subtask 101. <br />202. Estimate average and peak wastewater flows. <br />TASK 300 Evaluate Wastewater Treatment Processes: <br />301. Determine level of treatment required for effluent <br />disposal alternatives. <br />302. Predict effluent quality for disposal alternatives. <br />303. Incorporate findings into conceptual feasibility <br />report. <br />TASK 400 Evaluate Effluent Reuse Alternatives: <br />TASK -500 <br />401. Evaluate potential areas for effluent reuse such as <br />the following: <br />o Golf Courses <br />o Florida Gas Line Right -of -Way <br />o Parks <br />o Orange Groves <br />o Sod Farms <br />402. Compare reclaimed water demand to projected <br />wastewater treatment plant output (monthly water <br />balance). <br />403. Develop preliminary layout of reclaimed water <br />system including the distribution system. <br />404. Develop preliminary costs of reclaimed water system <br />including capital and operation (labor, power, and <br />maintenance). <br />405. Evaluate institutional aspects of reuse and public <br />acceptance. <br />406. Incorporate findings into conceptual feasibility <br />report. <br />Evaluate Deep Well Injection Alternative: <br />501. <br />Analyze available data for injection horizon <br />parameters. <br />9 <br />BORA. <br />63 FACE <br />
The URL can be used to link to this page
Your browser does not support the video tag.