Laserfiche WebLink
JAS 1 <br />�Ia <br />goo <br />63 ; 1.3 J5 <br />Commissioner Lyons <br />inquired if there is something <br />different <br />in this situation since the previous consideration. <br />Fred Mensing reported that he only spoke with Mr. Sembler <br />about this early today, and he has not had time to prepare; he <br />just wanted this matter to be delayed because Mr. Sembler only <br />got the notice today and the address on it should have been his <br />post office box, not 1616 North Indian River Drive, which is his <br />exwife's address. <br />ON MOTION by Commissioner Lyons, SECONDED by <br />Commissioner Bowman, Commissioners Bird and Wodtke <br />voting in opposition, the Board by a 3-2 vote <br />accepted the staff recommendation with the addi- <br />tion that we request the permitting people to give us <br />the opportunity for further comment if the applicant <br />presents additional facts that we do not have today. <br />Commissioner Wodtke stated that he is not faulting staff in <br />any way as he realizes mail can be misdirected, but he felt there <br />should have been some voice contact. <br />Chairman Scurlock felt staff stated that they talked to the <br />Sembler's consultant and engineer, and Planner Challacombe <br />confirmed that he talked to Engineer Dean Luethje. <br />Commissioner Bird stated that the only reason he voted in <br />opposition to the Motion was he did not feel staff had talked to <br />them, and he would, therefore, change his vote, and vote in favor <br />of the Motion. <br />DER/ARMY CORPS/DNR PERMIT_ APPLICATION (MERSER-MMacLEAN-APPLEWEST- <br />REBAR ) <br />Planner DeBlois made the staff presentation, as follows: <br />64 <br />