My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/12/1986
CBCC
>
Meetings
>
1980's
>
1986
>
2/12/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:00 AM
Creation date
6/12/2015 11:29:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/12/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Bird, SECONDED by <br />Commissioner Lyons, the Board unanimously <br />accepted the staff recommendation to concur <br />with the Treasure Coast Regional Planning <br />Council's Proposed D.R.I. Transportation <br />Review Policies and Standards. <br />DISCUSSION RE FUNDING FOR ROCKRIDGE_WASTEWATER IMPROVEMENT STUDY <br />AND ALSO BLUE CYPRESS LAKE AREA <br />Utilities Director Pinto reviewed the following memo: <br />TO: <br />THRU: <br />FROM: <br />RE: <br />BACKGROUND <br />THE HONORABLE MEMBERS OF <br />THE BOARD OF COUNTY <br />COMMISSIONERS <br />MICHAEL WRIGHT <br />COUNTY COMMISSIONER <br />TERRANCE G. PINTO <br />DIRECTOR.OF UTILITY SERVICES <br />JEFFREY A. BOONE <br />ENGINEERING OPERATIONS MANAGER <br />DATE: FEBRUARY 5, 1986 <br />SUBJECT: ROCKRIDGE <br />WASTEWATER <br />IMPROVEMENTS <br />ENGINEERING <br />FEASIBILITY STUDY <br />DECEMBER 10, 1985, MEMO TO BOARD OF COUNTY COMMISSIONERS FROM <br />RON BROOKS <br />A meeting was held with the Rockridge Homeowners Association on February <br />3, 1986, where Terry Pinto, Director of Utilities Services, provided <br />those in attendance with information regarding the wastewater <br />improvements in the subject subdivision. Discussion of the costs to each <br />homeowner resulted in a postive response from the Homeowners Association <br />along with a desire to proceed with the project. <br />nNnT.VCTC <br />A proposal for the Engineering Feasibility Study has been submitted by <br />Masteller and Moler Associates, Incorporated. The study will provide <br />preliminary design and determine the flow requirements and costs involved <br />in providing wastewater service to the Rockridge subdivision. <br />The total cost of the Engineering Feasibility Study is $7000.00 of which <br />$3000.00 will be required for soil and subsurface testing and $600.00 for <br />surveying expenses. <br />RECOMMENDATIONS <br />Staff recommends that the Honorable Board of County Commissioners <br />authorize funding of the Engineering Feasibility Study for the Rockridge <br />subdivision. 45 <br />NOK 63 FA;t.613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.