3. The amount of retainage with respect the Contract Documents; or (ii) that there may <br /> to progress payments will be as stipulated in not be other matters or issues between the <br /> the Agreement. parties that might entitle CONTRACTOR to be <br /> paid additionally by OWNER or entitle OWNER <br /> B. Review of Applications to withhold payment to CONTRACTOR. <br /> 1. ENGINEER will, within 10 days after 4. Neither ENGINEER's review of <br /> receipt of each Application for Payment, either CONTRACTOR's Work for the purposes of <br /> indicate in writing a recommendation of recommending payments nor ENGINEER's <br /> payment and present the Application to recommendation of any payment, including final <br /> OWNER or return the Application to payment, will impose responsibility on <br /> CONTRACTOR indicating in writing ENGINEER to supervise, direct, or control the <br /> ENGINEER's reasons for refusing to Work or for the means, methods, techniques, <br /> recommend payment. In the latter case, CDN- sequences, or procedures of construction, or <br /> TRACTOR may make the necessary the safety precautions and programs incident <br /> corrections and resubmit the Application. thereto, or for CONTRACTOR's failure to <br /> comply with Laws and Regulations applicable to <br /> 2. ENGINEER's recommendation of CONTRACTOR's performance of the Work. <br /> any payment requested in an Application for Additionally, said review or recommendation will <br /> Payment will constitute a representation by not impose responsibility on ENGINEER to <br /> ENGINEER to OWNER, based on make any examination to ascertain how or for <br /> ENGINEER's observations on the Site of the what purposes CONTRACTOR has used the <br /> executed Work as an experienced and qualified moneys paid on account of the Contract Price, <br /> design professional and on ENGINEER's or to determine that title to any of the Work, <br /> review of the Application for Payment and the materials, or equipment has passed to <br /> accompanying data and schedules, that to the OWNER free and clear of any Liens. <br /> best of ENGINEER's knowledge, information <br /> and belief: 5. ENGINEER may refuse to recom- <br /> mend the whole or any part of any payment if, <br /> a. the Work has progressed to the point in ENGINEER's opinion, it would be incorrect to <br /> indicated; make the representations to OWNER referred <br /> to in paragraph 14.02.B.2. ENGINEER may <br /> b, the quality of the Work is generally in also refuse to recommend any such payment <br /> accordance with the Contract Documents or, because of subsequently discovered <br /> (subject to an evaluation of the Work as a evidence or the results of subsequent <br /> functioning whole prior to or upon inspections or tests, revise or revoke any such <br /> Substantial Completion, to the results of any payment recommendation previously made, to <br /> subsequent tests called for in the Contract such extent as may be necessary in <br /> Documents, to a final determination of ENGINEER's opinion to protect OWNER from <br /> quantities and classifications for Unit Price loss because: <br /> Work under paragraph 9.08, and to any <br /> other qualifications stated in the a. the Work is defective, or completed <br /> recommendation); and Work has been damaged, requiring <br /> correction or replacement; <br /> c. The conditions precedent to <br /> CONTRACTOR's being entitled to such b. the Contract Price has been reduced <br /> payment appear to have been fulfilled in so by Written Amendment or Change orders; <br /> far as it is ENGINEER's responsibility to <br /> observe the Work. c. OWNER has been required to correct <br /> defective Work or complete Work in accor- <br /> 3. By recommending any such dance with paragraph 13.09; or <br /> payment ENGINEER will not thereby be <br /> deemed to have represented that: (i) inspec- �NIN IGI EER has ar-+i Ear k�,.-,��►tame of <br /> tions made to check the quality or the quantity the GGG rrren.G.o �f the events ons Amor_ <br /> of the Work as it has been performed have � Ar-AnnAnh 4502.A. <br /> been exhaustive, extended to every aspect of <br /> the Work in progress, or involved detailed C. Payment Becomes Due <br /> inspections of the Work beyond the responsi- <br /> bilities specifically assigned to ENGINEER in <br /> 00700-General Conditions REV 04-07.doe <br /> 00700-38 <br /> FAPubile WorttslENGINEERING DIV1S10N PROJECTS11210-Sandridge Driving Range Tee Renovation\Admimlbid documentst00700-General Conditions REV 04-07.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:11-OfficialDocuments:9069,Attachment Id 1,Page 105 <br />