4.04 Substantial Completion <br /> ENGINEER, 5 1 <br /> A. When CONTRACTOR considers the entire <br /> Work ready for its intended use CONTRACTOR shall <br /> due will ho nPir1_h.r_OWNER to CONTRACT-OR. notify OWNER and ENGINEER in writing that the <br /> entire Work is substantially complete (except for items <br /> D. Reduction in Payment specifically listed by CONTRACTOR as incomplete) <br /> and request that ENGINEER issue a certificate of <br /> 1. OWNER may refuse to make Substantial Completion. Promptly thereafter, <br /> payment of the full amount recommended by OWNER, CONTRACTOR, and ENGINEER shall <br /> ENGINEER because: make an inspection of the Work to determine the <br /> status of completion. If ENGINEER does not consider <br /> a. claims have been made against the Work substantially complete, ENGINEER will <br /> OWNER on account of CONTRACTOR's notify CONTRACTOR in writing giving the reasons <br /> performance or furnishing of the Work; therefore. lof GGn%6WiC%Ai0WFJWz the Work <br /> su bst�n4ia.II►■ romnletee I._AIGINEEGA ■gillnronnre and <br /> 191 Sig r a 11.0 ro%.A 1 b. Liens have been filed in connection deliver to OWNER a tentatiVe GeFtifiGate of Substantial <br /> with the Work, except where f'mmMation which shall fix the date of Substantial <br /> CONTRACTOR has delivered a specific <br /> Bond satisfactory to OWNER to secure the <br /> satisfaction and discharge of such Liens; befbFe finnl ►►mnnf OWNER hall have seven %,v%.A.7r1n■►.r-a <br /> c. there are other items entitling OWNmake wriffon nNor-finn fn ENGINEER as to nnit <br /> - <br /> ER to a set-off against the amount I •rices S of the •�4'19 orattaGhed If, a <br /> recommended; or , <br /> ttha Lnlnrtr is not sU tunr iall►► r+mmnlat� <br /> P <br /> d. OWNER has actual knowledge of the E,.3IAI r� X11 u6tI%Ihe 4 ripyR Aft �-,t�hmi.1��in.F I 11.r In of1-f I fA.hb <br /> occurrence of any of the events enumeratedgo <br /> in + paragraphs '14.02.B.5r.a through , "I UW1 <br /> 14.02.B.S.c or paragraph 5.02.A. r rlor>,tinn of%--I nLn1N R'S nhitmatiinnQ Rnlr �C� <br /> } <br /> 2. if OWNER refuses to make payment <br /> of the full amount recommended by rloli■rorto W1R and Cdefi�� <br /> ENGINEER, OWNER must give <br /> CONTRACTOR immediate written notice (with t�nt�' items t��r+mmnlcfcrl OF r►nrror+forl) <br /> a copy to ENGINEER} stating the reasons for <br /> such action and promptly pay CONTRACTOR <br /> any amount remaining after deduction of the ` <br /> amount so withheld. OWNER shall promptly <br /> pay CONTRACTOR the amount so withheld, or <br /> ENGINEER �qill deliver to OWNER and CONTRAG- <br /> any adjustment thereto agreed to by OWNER TOR a vOrettan reGgFnmeRdatinn as to division of <br /> and CONTRACTOR, when CONTRACTOR fese .1 .1* nPr%elnrlinaIZIJ fi Al nAyrnpnt hint►pn <br /> corrects to OWN ER's satisfaction the reasons , <br /> nnor� • n safot►■ nnr1 nrntar+finn,,, of fho Wnrk <br /> for such action. r� , r �, .._,,.,, _� <br /> ns,1ran <br /> imp nto- <br /> I I".f%.%% %A%I a I%I%.%.11 11 5 W%A I%.q I Ge and warraRties <br /> I itenanGe, <br /> . e <br /> es <br /> , <br /> 3. If it is subsequently determined that <br /> OWNER's refusal of payment was not justified, GONTR CTnR WIMP nfhonA►iQA in UWand nnse <br /> L. <br /> the amount wrongfully withheld shall be treated i�rm l A1C-11111 F=R inoil writ,TwoU�nr-�, nrinr to ENGINEER's <br /> as an amount due as determined by paragraph <br /> 14.02.C.1. finn ' <br /> �' a Mn%oil L7lnr[n1GR anr1 rnnlTRerTtlR until fiRal <br /> 14.03 CONTRACTOR"s Warranty of Title . <br /> A. CONTRACTOR warrants and guarantees B. OWNER shall have the right to exclude <br /> that title to all Work, materials, and equipment covered CONTRACTOR from the Site after the date of <br /> by any Application for Payment, whether incorporated Substantial Completion= but OWNER shall allow CON- <br /> in the Project or not, will pass to OWNER no later than TRACTOR reasonable access to complete or correct <br /> the time of payment free and clear of all Liens. items on the tentative list. <br /> 00700-Genera[Conditions REV 04-07.doc <br /> 00700-39 <br /> F:\Pubiic Works\ENGINEERING DIVISION PROJECTS11210-Sandridge Driving Range Tee Renovation\Admim%id documentsW0700-General Conditions REV 04-07.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:11-OfficialDocuments:9069,Attachment Id 1,Page 106 <br />