Laserfiche WebLink
emergency conditions and may be ordered by the ENGINEER in writing. <br /> 4. All costs of inspection and testing performed during overtime work by the <br /> CONTRACTOR, which is allowed solely for the convenience of the <br /> CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to the <br /> OWNER to deduct the costs of all such inspection and testing from any <br /> payments otherwise due the CONTRACTOR, <br /> 5. All costs of OWNER's employees and costs of ENGI NEER's Consultant resulting <br /> from overtime work by the CONTRACTOR, which is allowed solely for the <br /> convenience of the CONTRACTOR, shall be borne by the CONTRACTOR, and a <br /> creditg iven to OWNER to deduct all such costs from any payments otherwise <br /> due the CONTRACTOR. <br /> 6. <br /> No work shall commence before 7 a.m. or continue after 5 p.m. except in case of <br /> emergency upon specific permission of the ENGINEER. <br /> SC-6.06 Concerning Subcontractors, Suppliers, and others <br /> SC-6.06.0. Add the following sentence at the end of paragraph GC-6.06.C: <br /> OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or <br /> entity, to the extent practicable, information about amounts paid to CONTRACTOR on <br /> p <br /> account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or <br /> other individual or entity. <br /> SC-6.08 Permits <br /> SC-6.08 Add the following paragraphs immediately after paragraph GC-6.08.A: <br /> 1. The OWNER has obtained the following permits (copies of these permits are <br /> contained in Appendix "A"): <br /> A. Indian River Farms Water Control District— Permit no, Pending <br /> 2. The CONTRACTOR shall obtain and pay for all other required permits and <br /> licenses. The CONTRACTOR shall provide copies of the permits to the <br /> OWNER and ENGINEER and shall comply with all conditions contained in <br /> the permits at no extra cost to the OWNER. <br /> 3. The CONTRACTOR shall be familiar with all permit requirements during <br /> construction and shall be responsible for complying with these <br /> requirements. The cost of this effort shall be included in the pay item in <br /> which the work is most closely associated with. <br /> SCA 3.03 Test and Inspections <br /> SC-13.03.B.B, Delete the first sentence of paragraph GC-13.03.B in its entirety, and insert the <br /> following sentences in its place.- <br /> B. <br /> lace:B. OWNER shall employ and pay for the services of an independent testing laboratory to <br /> perform all initial inspections, tests, or approvals required by the Contract Documents <br /> except those inspections, tests, or approvals listed immediately below. Subsequent <br /> p <br /> inspections, tests, or approvals required after initial failing inspections, tests, or <br /> approvals shall be aid for by the CONTRACTOR by back charge to subsequent <br /> pp p a <br /> app and y for the <br /> applications for payment. The CONTRACTOR shall arrange, obtain, <br /> p <br /> following inspections, tests, or approvals: <br /> ooso0M6 <br /> 00800-supplementary Conditions 06-09 rev.doc <br /> 00800 6FAPublic Works\ENG1NEERlNG D1VISiON PRaJECTS11210-Sandridge Driving Range Tee Renovation\Admimlbid documentsl00800-Supplementary Conditions <br /> SmeadSoft Reprint Date:Monday,Jadga ff,1�,�W� 09:22:12-OfficialDocuments:9069,Attachment Id 1,Page 117 <br />