My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-124A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-124A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 8:26:01 PM
Creation date
1/11/2016 9:47:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/03/2012
Control Number
2012-124A
Agenda Item Number
8.Q
Entity Name
Ag-Scape Services
Subject
Sandridge Golf Course Driving Range
Tee Renovations Contract
Area
Sandridge Golf Course
Project Number
1210
Bid Number
2012040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor shall conduct a walk-through inspection of the Project to document a <br /> list of any items required to render the Work on the Project complete, <br /> satisfactory, and acceptable under this Agreement (herein the "Statutory List"). <br /> The Statutory List shall be reduced to writing and circulated among the Owner, <br /> the Engineer, and the Contractor by the owner or the Engineer within 30 <br /> calendar days after substantial completion. The owner and Contractor <br /> acknowledge and agree that: 1) the failure to include any corrective work, or <br /> pending items that are not yet completed, on the Statutory List does not alter the <br /> responsibility of the Contractor to complete all of the Work under this Agreement; <br /> 2) upon completion of all items on the Statutory List, the Contractor may submit a <br /> pay request for all remaining retainage except as otherwise set forth in this <br /> Agreement; and 3) any and all items that require correction under this Agreement <br /> and that are identified after the preparation of the Statutory List remain the <br /> obligation of the Contractor to complete to the owner's satisfaction under this <br /> Agreement. After receipt of the Statutory List by the Contractor, the Contractor <br /> acknowledges and agrees that it will diligently proceed to complete all items on <br /> the Statutory List and schedule a final walk-through in anticipation of final <br /> completion on the Project." <br /> SC-14.04B add the following new paragraph immediately after paragraph GC 14.04B: <br /> C. At the time of delivery of the tentative certificate of Substantial Completion, Engineer will <br /> deliver to owner and Contractor a written recommendation as to division of responsibilities <br /> pg <br /> endin final payment between owner and Contractor with respect to security, operation, <br /> safety, and protection of the Work, maintenance, heat, utilities, insurance, and warranties and <br /> guarantees <br /> SC-14.07 Final Payment <br /> SC-14.07.C.1. Delete paragraph GC-14.07.C.1 in its entirely and insert the following <br /> paragraph in its place. <br /> C. Payment Becomes Due <br /> 1. Payment shall be made by OWNER to CONTRACTOR according to the " Local <br /> Government Prompt Payment Act" , Florida Statutes section 218.70, et. seq. <br /> SC-15.0'1 OWNER May Suspend Work <br /> SC-15.01.A Delete the last sentence in paragraph GC-15.01.A and insert the following in its <br /> place.- <br /> CONTRACTOR <br /> lace.CONTRACTOR shall be allowed an extension of the Contract Times, directly attributable to any <br /> such suspension if CONTRACTOR makes a Claim for an extension as provided In paragraph <br /> 10.05. CONTRACTOR shall not be allowed an adjustment of the Contract Price and <br /> CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other eco- <br /> nomic loss arising out of or resulting from such Work suspension. <br /> SCA 5.02 OWNER 11r'lay Terminate For Cause <br /> SC-15.02.A.5 and SC-15.02.A.5 Add the following new paragraphs immediately after <br /> paragraph GC-15.02.A.4.- <br /> 5. <br /> C-15.0,2.A.4:5. CONTRACTOR's violation of Section 02225 -- "Erosion Control and Treatment of <br /> Dewatering Water From the Construction Site." <br /> 00800-8 <br /> 00800-supplementary Conditions 05-09 rev.doc <br /> 00800 8F:\Public Works1ENGINEERING DIVIS10N PRG3ECTSL121O-Sandridge Driving Range Tee Renovation\Admim\bid documentsl00800_Supplementary Conditions <br /> SmeadSoft Reprint Date:Monday,3ffM MV2&8-09:22:13-OfficialDocuments:9069,Attachment Id 1,Page 119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.