Laserfiche WebLink
SECTION - 440 — UNDERDRAIN <br /> The work specified in this item shall conform to Section 440 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010). <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No. 440-1-10 -- Underdrain "Type 1" (4") Per Linear Foot <br /> Bid Item No. 440-70 — Underdrain Inspection Box (4") Per Each <br /> Bid Item No. 440-73--1 — Underdrain outlet Pipe Non-Perforated -- Per Linear Foot <br /> SECTION - 520 - CONCRETE CURB AND GUTTER <br /> The work specified in this item shall conform to Section 520 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010). <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No. 520-1-8 -- Concrete Curb (Type "D") --- Per Linear foot <br /> SECTION - 522 -- CONCRETE SIDEWALK <br /> The work specified in this item shall conform to Section 522 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010). <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No. 522-1 -- Concrete Cart path (0" Thick) -- Per Square Yard <br /> Bid Item No. 522-2 — Concrete Pad (4" Thick wl Wire Mesh) -- Per Square Yard <br /> SECTION - 570 -- PERFORMANCE TURF <br /> The work specified in this item shall conform to Section 570 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (20'10). <br /> A. Description: Sod for the project shall be as specified on the Engineers plans. This <br /> work shall also include mowing in accordance with Section 104-7.2,to be mowed at 5" <br /> height with a mulching mower. <br /> B. Work Included: Scope of Work: The work specified in this section consists of the <br /> establishing of a stand of grass, within the project, right--of-way, easements: and other <br /> areas indicated on the Drawings, by furnishing and placing grass sod. Also included <br /> are fertilizing, watering and maintenance as required to assure a healthy stand of <br /> grass. Two applications of fertilizer will be required with the initial application being <br /> fertilizer and the second application being "weed and feed". <br /> 01025-20 Technical Specifications <br /> FAPubIic Works\E N G I N E E R I N G DIVISION PROJECTSI121 O-Sandridge Driving Range Tee RenOvation\Admimlbid documents\TechnicaI <br /> Specifications.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:25-OfficialDocuments:9069,Attachment Id 1,Page 180 <br />