Laserfiche WebLink
17. Drawings--That part of the Contract completion date or time prior to Substantial Comple- <br /> Documents prepared or approved by ENGINEER tion of all the Work, <br /> which graphically shows the scope, extent, and <br /> character of the Work to be performed by 28. Notice of Award--The written notice by <br /> CONTRACTOR, Shop Drawings and other OWNER to the apparent successful bidder stating that <br /> CONTRACTOR submittals are not Drawings as so upon timely compliance by the apparent successful <br /> defined. bidder with the conditions precedent listed therein, <br /> OWNER will sign and deliver the Agreement. <br /> 18. Effective Date of the Agreement--The <br /> date indicated in the Agreement on which it becomes 29. Notice to Proceed--A written notice given <br /> effective, but if no such date is indicated, it means the by OWNER to CONTRACTOR fixing the date on <br /> date on which the Agreement is signed and delivered which the Contract Times will commence to run and <br /> by the last of the two parties to sign and deliver, on which CONTRACTOR shall start to perform the <br /> Work under the Contract Documents. <br /> 19. ENGINEER--The individual or entity <br /> named as such in the Agreement. 30. OWNER--The individual, entity, public <br /> body, or authority with whom CONTRACTOR has <br /> 20 EnrGrn►E�s G.,ns►►ftanf__❑n individual 9 entered into the Agreement and for whom the Work is <br /> entity having a contract with E N G I N E S �rnish to be performed. <br /> services as ENGINEER's in ent professional <br /> associate or consult respect to the Project and 31. Partial U lization--Use by OWNER of a <br /> who is ' ' ed as such in the Supplementary substantially completed part of the Work for the pur- <br /> pose for which it is intended (or a related purpose) <br /> prior to Substantial Completion of all the Work. <br /> 21. Field Order--A written order issued by <br /> ENGINEER which requires minor changes in the 32. PCBs--Polychlorinated biphenyls. <br /> Work but which does not involve a change in the <br /> Contract Price or the Contract Times. 33. Petroleum--Petroleum, including crude oil <br /> or any fraction thereof which is liquid at standard <br /> 22. General Requirements---Sections of conditions of temperature and pressure (60 degrees <br /> Division 1 of the Specifications. The General Fahrenheit and 14.7 pounds per square inch <br /> Requirements pertain to all sections of the Specifica- absolute), such as oil, petroleum, fuel oil, oil sludge, oil <br /> tions. refuse, gasoline, kerosene, and oil mixed with other <br /> non-Hazardous Waste and crude oils. <br /> 23. Hazardous Environmental Condition--The <br /> presence at the Site of Asbestos, PCBs, Petroleum, 34. Project--The total construction of which <br /> Hazardous Waste, or Radioactive Material in such the Work to be performed under the Contract <br /> quantities or circumstances that may present a Documents may be the whole, or a part as may be <br /> substantial danger to persons or property exposed indicated elsewhere in the Contract Documents. <br /> thereto in connection with the Work. <br /> 35. Project Manual-The bound documentary <br /> 24. Hazardous waste--The terra Hazardous information prepared for bidding and constructing the <br /> Waste shall have the meaning provided in Section Work. A listing of the contents of the Project Manual, <br /> 1004 of the Solid Waste Disposal Act (42 USC which may be bound in one or more volumes, is <br /> Section 6903)as amended from time to time. contained in the table(s)of contents. <br /> 25. Laws and Regulations; Laws or Regulat 36. Radioactive Material-Source, special <br /> ions--Any and all applicable laws, rules, regulations, nuclear, or byproduct material as defined by the <br /> ordinances, codes, and orders of any and all govern- Atomic Energy Act of 1954 (42 USC Section 2011 et <br /> mental bodies, agencies, authorities, and courts seq.)as amended from time to time. <br /> having jurisdiction. <br /> 37. Resident Project Representative--The <br /> 26. Liens--Charges, security interests, or authorized representative of ENGINEER who may be <br /> encumbrances upon Project funds, real property, or assigned to the Site or any part thereof. <br /> personal property, <br /> 38. Samples--Physical examples of <br /> 27. Milestone--A principal event specified in materials, equipment, or workmanship that are <br /> the Contract Documents relating to an intermediate representative of some portion of the Work and which <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-6 <br /> FAP ublic WorksIENGINEERING DIVISION PROJECTS11210-Sandridge Driving Range Tee Renovation\Admimlbid documents100700-General Conditions REV 04-07.doe <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:04-OfficialDocuments:9069,Attachment Id 1,Page 73 <br />