Laserfiche WebLink
i <br /> establish the standards by which such portion of the 47. Unit Price Work--Work to be paid for on <br /> Work will be judged. the basis of unit prices. <br /> 39. Shop Drawings--All drawings, diagrams, 48. Work--The entire completed construction <br /> illustrations, schedules, and other data or information or the various separately identifiable parts thereof re- <br /> which are specifically prepared or assembled by or for quired to be provided under the Contract Documents. <br /> CONTRACTOR and submitted by CONTRACTOR to Work includes and is the result of performing or <br /> illustrate some portion of the Work. providing all labor, services, and documentation <br /> necessary to produce such construction, and <br /> 40. Site--Lands or areas indicated in the furnishing, installing, and incorporating all materials <br /> Contract Documents as being furnished by OWNER and equipment into such construction, all as required <br /> upon which the Work is to be performed, including by the Contract Documents. <br /> rights-of-way and easements for access thereto, and <br /> such other lands furnished by OWNER which are 49. Work Change Directive--A written <br /> designated for the use of CONTRACTOR. statement to CONTRACTOR issued on or after the <br /> Effective Date of the Agreement and signed by <br /> 41. Specifications--That part of the Contract OWNER and recommended by ENGINEER ordering <br /> Documents consisting of written technical descriptions an addition, deletion, or revision in the Work, or <br /> of materials, equipment, systems, standards, and responding to differing or unforeseen subsurface or <br /> workmanship as applied to the Work and certain physical conditions under which the Work is to be <br /> administrative details applicable thereto. performed or to emergencies. A Work Change <br /> Directive will not change the Contract Price or the <br /> 42. Subcontractor--An individual or entity Contract Times but is evidence that the parties expect <br /> having a direct contract with CONTRACTOR or with that the change ordered or documented by a Work <br /> any other Subcontractor for the performance of a part Change Directive will be incorporated in a subse- <br /> of the Work at the Site. quently issued Change Order following negotiations by <br /> the parties as to its effect, if any, on the Contract Price <br /> 43. Substantial Completion--The time at or Contract Times. <br /> which the Work (or a specified part thereof) has <br /> progressed to the point where, in the opinion of 50. written Amendment--A written statement <br /> ENGINEER, the Work (or a specified part thereof) is modifying the Contract Documents, signed by <br /> sufficiently complete, in accordance with the Contract OWNER and CONTRACTOR on or after the Effective <br /> Documents, so that the Work (or a specified part Date of the Agreement and normally dealing with the <br /> thereof) can be utilized for the purposes for which it is nonengineering or nontechnical rather than strictly <br /> intended. The terms "substantially complete" and construction-related aspects of the Contract Docu- <br /> "substantially completed"as applied to all or part of the ments. <br /> Work refer to Substantial Completion thereof. <br /> 1.02 Terminology <br /> 44. Supplementary Conditions--That part of <br /> the Contract Documents which amends or A. Intent of Certain Terms or Adjectives <br /> supplements these General Conditions. <br /> 1. Whenever in the Contract Documents the <br /> 45. Supplier--A manufacturer, fabricator, terms "as allowed," "as approved," or terms of like <br /> supplier, distributor, materialman, or vendor having a effect or import are used, or the adjectives <br /> direct contract with CONTRACTOR or with any "reasonable," "suitable," "acceptable," "proper," <br /> Subcontractor to furnish materials or equipment to be "satisfactory," or adjectives of like effect or import <br /> incorporated in the Work by CONTRACTOR or any are used to describe an action or determination of <br /> Subcontractor. ENGINEER as to the Work, it is intended that such <br /> action or determination will be solely to evaluate, in <br /> 45. Underground Facilities--All underground general, the completed Work for compliance with <br /> pipelines, conduits, ducts, cables, wires, manholes, the requirements of and information in the Contract <br /> vaults, tanks, tunnels, or other such facilities or Documents and conformance with the design <br /> attachments, and any encasements containing such concept of the completed Project as a functioning <br /> facilities, including those that convey electricity, gases, whole as shown or indicated in the Contract <br /> steam, liquid petroleum products, telephone or other Documents (unless there is a specific statement <br /> communications, cable television, water, wastewater, indicating otherwise). The use of any such term or <br /> storm water, other liquids or chemicals, or traffic or adjective shall not be effective to assign to ENGI- <br /> other control systems. NEER any duty or authority to supervise or direct <br /> the performance of the Work or any duty or <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-7 <br /> FAPublic WvrksIENGINEERING DIVISIGN PRGJECTS11210-Sandridge Driving Range Tee Renovation\Admimkbid documents100700-General Conditions REV 04-07.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:04-OfficialDocuments:9069,Attachment Id 1,Page 74 <br />