My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-124A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-124A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 8:26:01 PM
Creation date
1/11/2016 9:47:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/03/2012
Control Number
2012-124A
Agenda Item Number
8.Q
Entity Name
Ag-Scape Services
Subject
Sandridge Golf Course Driving Range
Tee Renovations Contract
Area
Sandridge Golf Course
Project Number
1210
Bid Number
2012040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
authority to undertake responsibility contrary to the used in the Contract Documents in accordance with <br /> provisions of paragraph 9.1 9 or any other provision such recognized meaning. <br /> of the Contract Documents. <br /> B. Day ARTICLE 2 - PRELIMINARY MATTERS <br /> 1. The word "day" shall constitute a <br /> calendar day of 24 hours measured from 2.01 Delivery of Bonds <br /> midnight to the next midnight. <br /> A. When CONTRACTOR delivers the executed <br /> C. Defective Agreements to OWNER, CONTRACTOR shall also <br /> deliver to OWNER such Bonds as CONTRACTOR <br /> 1. The word "defective,"when modifying may be required to furnish. <br /> the word "Work," refers to Work that is <br /> unsatisfactory, faulty, or deficient in that it does 2.92 Copies of Documents <br /> not conform to the Contract Documents or does <br /> not meet the requirements of any inspection, A. OWNER shall furnish to CONTRACTOR up <br /> reference standard, test, or approval referred to to ten copies of the Contract Documents. Additional <br /> in the Contract Documents, or has been copies will be furnished upon request at the cost of <br /> damaged prior to ENGINEER's recom- reproduction. <br /> mendation of final payment (unless responsi- <br /> bility for the protection thereof has been 2.93 Commencement of Contract Times;Notice <br /> assumed by OWNER at Substantial to Proceed <br /> Completion in accordance with paragraph <br /> 14.04 or 14.95). A. The Contract Times will commence to run on <br /> the thirtieth day after the Effective Date of the Agree- <br /> D. Furnish, Install, Perform, Provide ment or, if a Notice to Proceed is given, on the day <br /> indicated in the Notice to Proceed. A Notice to Pro- <br /> 1. <br /> -Tl-��� :ra "1 �rni�h!" �TV�►hen icer _ire ceed may be given at any time within 39 days after the <br /> W, rn::1forinis <br /> , Effective Date of the Agreement. In no event will the <br /> errs iinment Qhall mean__tzsupply anddeliverContract Times commence to run later than the <br /> CzAid <br /> sixtieth day after the day of Bid opening or the thirtieth <br /> day after the Effective Date of the Agreement, <br /> use or installation a.n.Gi a on operable whichever date is earlier. <br /> 2.94 Starting the work <br /> A. CONTRACTOR shall start to perform the <br /> Work on the date when the Contract Times com- <br /> mence to run. No Work shall be done at the Site prior <br /> to the date on which the Contract Times commence to <br /> use. run. <br /> 3. T„ „1I{fnrcic,. "narfnrrn" mr__"nmyid f" 2,05 Before Starting Construction <br /> when used in Genner-flon With Rep4nes <br /> A. CONTRACTOR's Review of Contract Docu- <br /> ar,r! i„rtnl9 1 l��irl cer-�►ir+e�' maw ialf;, 91F meats: Before undertaking each part of the Work, <br /> equipment r+mmplete and _reach!fnr intended CONTRACTOR shall carefully study and compare the <br /> use. Contract Documents and check and verify pertinent <br /> figures therein and all applicable field measurements. <br /> 4. When "furnish," "install," "perform," or CONTRACTOR shall promptly report in writing to <br /> "provide" is not used in connection with services, ENGINEER any conflict, error, ambiguity, or <br /> materials, or equipment in a context clearly discrepancy which CONTRACTOR may discover and <br /> requiring an obligation of CONTRACTOR, shall obtain a written interpretation or clarification from <br /> "provide" is implied. ENGINEER before proceeding with any Work affected <br /> thereby; however, CONTRACTOR shall not be liable <br /> E. Unless stated otherwise in the Contract Docu- to OWNER or ENGINEER for failure to report any <br /> meats, words or phrases which have a well-known conflict, error, ambiguity, or discrepancy in the <br /> technical or construction industry or trade meaning are <br /> 00700-General Conditions REV 04-07,doc <br /> 00700-8 <br /> FAPublic Works\EN G I N E E R I N G DIVISION PROJECTSt1210-Sandridge Driving Range Tee Renovation\Admimlbid documents100700_General Conditions REV 04-07.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:04-OfficialDocuments:9069,Attachment Id 1,Page 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.