Laserfiche WebLink
3,02 Reference Standards B. Resolving Discrepancies <br /> A. Standards, Specifications, Codes, Laws, and 1. Except as may be otherwise <br /> Regulations specifically stated in the Contract Documents, <br /> the provisions of the Contract Documents shall <br /> I. Reference to standards, specifica- take precedence in resolving any conflict, error, <br /> tions, manuals, or codes of any technical ambiguity, or discrepancy between the <br /> society, organization, or association, or to Laws provisions of the Contract Documents and: <br /> or Regulations, whether such reference be <br /> specific or by implication, shall mean the stan- a. the provisions of any standard, <br /> dard, specification, manual, code, or Laws or specification, manual, code, or instruction <br /> Regulations in effect at the time of opening of (whether or not specifically incorporated by <br /> Bids (or on the Effective Date of the Agreement reference in the Contract Documents); or <br /> if there were no Bids), except as may be <br /> otherwise specifically stated in the Contract b. the provisions of any Laws or <br /> Documents. Regulations applicable to the performance <br /> of the Work(unless such an interpretation of <br /> 2. No provision of any such standard, the provisions of the Contract Documents <br /> specification, manual or code, or any instruction would result in violation of such Law or <br /> of a Supplier shall be effective to change the Regulation). <br /> duties or responsibilities of OWNER, <br /> CONTRACTOR, or ENGINEER, or any of their 3.04 Amending and Supplementing Contract <br /> subcontractors, consultants, agents, or employ- Documents <br /> ees from those set forth in the Contract <br /> Documents, nor shall any such provision or A. The Contract Documents may be amended to <br /> instruction be effective to assign to OWNER, provide for additions, deletions, and revisions in the <br /> ENGINEER, or any of ENGINEER's Work or to modify the terms and conditions thereof in <br /> Consultants, agents, or employees any duty or one or more of the following ways; (i) a Written <br /> authority to supervise or direct the performance Amendment; (ii) a Change Order; or (iii) a Work <br /> of the Work or any duty or authority to Change Directive. <br /> undertake responsibility inconsistent with the <br /> provisions of the Contract Documents. B. The requirements of the Contract Documents <br /> may be supplemented, and minor variations and <br /> 3.03 Reporting and Resolving Discrepancies deviations in the Work may be authorized, by one or <br /> more of the following ways: (i) a Field order; (ii) <br /> A. Reporting Discrepancies ENGINEER's approval of a Shop Drawing or Sample; <br /> or (iii) ENGINEER's written interpretation or clarifi- <br /> 1. If, during the performance of the cation, <br /> Work, CONTRACTOR discovers any conflict, <br /> error, ambiguity, or discrepancy within the Con- 3.05 Reuse of Documents <br /> tract Documents or between the Contract <br /> Documents and any provision of any Law or A. CONTRACTOR and any Subcontractor or <br /> Regulation applicable to the performance of the Supplier or other individual or entity performing or <br /> Work or of any standard, specification, manual furnishing any of the Work under a direct or indirect <br /> or code, or of any instruction of any Supplier, contract with OWNER: (i) shall not have or acquire <br /> CONTRACTOR shall report it to ENGINEER in any title to or ownership rights in any of the Drawings, <br /> writing at once. CONTRACTOR shall not Specifications, or other documents (or copies of any <br /> proceed with the Work affected thereby(except thereof) prepared by or bearing the seal of <br /> in an emergency as required by paragraph ENGINEER or ENGINEER's Consultant, including <br /> 6.16.A) until an amendment or supplement to electronic media editions: and (ii) shall not reuse any <br /> the Contract Documents has been issued by of such Drawings, Specifications, other documents, or <br /> one of the methods indicated in paragraph copies thereof on extensions of the Project or any <br /> 3,04; provided, however, that CONTRACTOR other project without written consent of OWNER and <br /> shall not be liable to OWNER or ENGINEER for ENGINEER and specific written verification or <br /> failure to report any such conflict, error, adaption by ENGINEER. This prohibition will survive <br /> ambiguity, or discrepancy unless CON- final payment, completion, and acceptance of the <br /> TRACTOR knew or reasonably should have Work, or termination or completion of the Contract. <br /> known thereof. Nothing herein shall preclude CONTRACTOR from <br /> 00700-General Conditions REV 04-07.doe <br /> 00700-10 <br /> FAPablic Works\ENGINEERING DIVISION PROJECTS\1210-Sandridge Driving Range Tee RenovationlAdmimlbid documents100700_General Conditions REV 04-07.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:04-OfficialDocuments:9069,Attachment Id 1,Page 77 <br />