Laserfiche WebLink
proposed by CONTRACTOR is functionally <br /> B. All materials and equipment incorporated into equal to that named and sufficiently similar so <br /> the Work shall be as specified or, if not specified, shall that no change in related Work will be required, <br /> be of good quality and new, except as otherwise it may be considered by ENGINEER as an <br /> provided in the Contract Documents. All warranties "or-equal" item, in which case review and <br /> and guarantees specifically called for by the Specifica- approval of the proposed item may, in <br /> tions shall expressly run to the benefit of OWNER. If ENGINEER's sole discretion, be accomplished <br /> required by ENGINEER, CONTRACTOR shall furnish without compliance with some or all of the <br /> satisfactory evidence (including reports of required requirements for approval of proposed substi- <br /> tests) as to the source, kind, and quality of materials tute items. For the purposes of this paragraph <br /> and equipment. All materials and equipment shall be 6.05.A.1, a proposed item of material or <br /> stored, applied, installed, connected, erected, equipment will be considered functionally equal <br /> protected, used, cleaned, and conditioned in to an item so named if: <br /> accordance with instructions of the applicable <br /> Supplier, except as otherwise may be provided in the a. in the exercise of reasonable <br /> Contract Documents. judgment ENGINEER determines that: (i) it <br /> is at least equal in quality, durability, <br /> 5.04 Progress Schedule appearance, strength, and design <br /> characteristics; (ii) it will reliably perform at <br /> A. CONTRACTOR shall adhere to the progress least equally well the function imposed by <br /> schedule established in accordance with paragraph the design concept of the completed Project <br /> 2.07 as it may be adjusted from time to time as as a functioning whole, and; <br /> provided below. <br /> b. CONTRACTOR certifies that: (i) <br /> 1. CONTRACTOR shall submit to there is no increase in cost to the OWNER, <br /> ENGINEER for acceptance (to the extent indi- and (ii) it will conform substantially, even <br /> cated in paragraph 2.07) proposed adjustments with deviations, to the detailed requirements <br /> in the progress schedule that will not result in of the item named in the Contract <br /> changing the Contract Times (or Milestones). Documents. <br /> Such adjustments will conform generally to the <br /> progress schedule then in effect and additional- 2. Substitute Items <br /> ly will comply with any provisions of the General <br /> Requirements applicable thereto. a. If in ENGINEER's sole discretion an <br /> item of material or equipment proposed by <br /> 2. Proposed adjustments in the CONTRACTOR does not qualify as an <br /> progress schedule that will change the Contract "or-equal" item under paragraph 6.05.A.1, it <br /> Times (or Milestones) shall be submitted in will be considered a proposed substitute <br /> accordance with the requirements of Article 12. item. <br /> Such adjustments may only be made by a <br /> Change order or Written Amendment in actor- b. CONTRACTOR shall submit suffi- <br /> dance with Article 12. tient information as provided below to allow <br /> ENGINEER to determine that the item of <br /> 6.05 Substitutes and"Or-Equals" material or equipment proposed is <br /> essentially equivalent to that named and an <br /> A. Whenever an item of material or equipment is acceptable substitute therefor. Requests for <br /> specified or described in the Contract Documents by review of proposed substitute items of <br /> using the name of a proprietary item or the name of a material or equipment will not be accepted <br /> particular Supplier, the specification or description is by ENGINEER from anyone other than <br /> intended to establish the type, function, appearance, CONTRACTOR. <br /> and quality required. Unless the specification or <br /> description contains or is followed by words reading c. The procedure for review by ENGI- <br /> that no like, equivalent, or "or-equal" item or no NEER will be as set forth in paragraph <br /> substitution is permitted, other items of material or 6.05.A.2.d, as supplemented in the General <br /> equipment or material or equipment of other Suppliers Requirements and as ENGINEER may <br /> may be submitted to ENGINEER for review under the decide is appropriate under the <br /> circumstances described below. circumstances. <br /> 1. "Or-Equal" Items: If in ENGINEER's d. CONTRACTOR shall first make <br /> sole discretion an item of material or equipment written application to ENGINEER for review <br /> 00700-General Conditions REV 04-07.doe <br /> 00700-19 <br /> FAPublic Works\ENGINEERING DIVISI0N PRCJECTS11210-Sandridge Driving Range Tee Renovation\Admimlbid documents100700-General Conditions REV 04-07.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:06-OfficialDocuments:9069,Attachment Id 1,Page 86 <br />