Laserfiche WebLink
of a proposed substitute item of material or Change Order for a substitute or an approved Shop <br /> equipment that CONTRACTOR seeks to Drawing for an "or equal." ENGINEER will advise <br /> furnish or use. The application shall certify CONTRACTOR in writing of any negative <br /> that the proposed substitute item will determination. <br /> perform adequately the functions and <br /> achieve the results called for by the general D. Special Guarantee: OWNER may require <br /> design, be similar in substance to that CONTRACTOR to furnish at CONTRACTOR's ex- <br /> specified, and be suited to the same use as pense a special performance guarantee or other <br /> that specified. The application will state the surety with respect to any substitute. <br /> extent, if any, to which the use of the pro- <br /> posed substitute item will prejudice E. ENGINEER's Cost Reimbursement <br /> CONTRACTOR's achievement of Substan- ENGINEER will record time required by ENGINEER <br /> tial Completion on time, whether or not use and ENGINEER's Consultants in evaluating substitute <br /> of the proposed substitute item in the Work proposed or submitted by CONTRACTOR pursuant to <br /> will require a change in any of the Contract paragraphs 6.05.A.2 and 6.05.B and in making <br /> Documents (or in the provisions of any other changes in the Contract Documents (or in the <br /> direct contract with OWNER for work on the provisions of any other direct contract with OWNER <br /> Project) to adapt the design to the proposed for work on the Project) occasioned thereby. Whether <br /> substitute item and whether or not or not ENGINEER approves a substitute item so pro- <br /> incorporation or use of the proposed substi- posed or submitted by CONTRACTOR, CON- <br /> tute item in connection with the Work is sub- TRACTOR shall reimburse OWNER for the charges <br /> ject to payment of any license fee or royalty. of ENGINEER and ENGINEER's Consultants for <br /> All variations of the proposed substitute evaluating each such proposed substitute. <br /> item from that specified will be identified in <br /> the application, and available engineering, F. CONTRACTOR's Expense: CONTRACTOR <br /> sales, maintenance, repair, and shall provide all data in support of any proposed <br /> replacement services will be indicated. The substitute or"or-equal"at CONTRACTOR's expense. <br /> application will also contain an itemized esti- <br /> mate of all costs or credits that will result 5.05 Concerning Subcontractors, Suppliers, <br /> directly or indirectly from use of such and others <br /> substitute item, including costs of redesign <br /> and claims of other contractors affected by A. CONTRACTOR shall not employ any <br /> any resulting change, all of which will be Subcontractor, Supplier, or other individual or entity <br /> considered by ENGINEER in evaluating the (including those acceptable to OWNER as indicated in <br /> proposed substitute item. ENGINEER may paragraph 6.06.E), whether initially or as a <br /> require CONTRACTOR to furnish additional replacement, against whom OWNER may have <br /> data about the proposed substitute item. reasonable objection. CONTRACTOR shall not be <br /> required to employ any Subcontractor, Supplier, or <br /> B. Substitute Construction Methods or Proce- other individual or entity to furnish or perform any of <br /> dures: If a specific means, method, technique, se- the Work against whom CONTRACTOR has reason- <br /> quence, or procedure of construction is shown or able objection. <br /> indicated in and expressly required by the Contract <br /> Documents, CONTRACTOR may furnish or utilize a B. If the Supplementary Conditions require the <br /> substitute means, method, technique, sequence, or identity of certain Subcontractors, Suppliers, or other <br /> procedure of construction approved by ENGINEER. individuals or entities to be submitted to OWNER in <br /> CONTRACTOR shall submit sufficient information to advance for acceptance by OWNER by a specified <br /> allow ENGINEER, in ENGINEER's sole discretion, to date prior to the Effective Date of the Agreement, and <br /> determine that the substitute proposed is equivalent to if CONTRACTOR has submitted a list thereof in <br /> that expressly called for by the Contract Documents. accordance with the Supplementary Conditions, <br /> The procedure for review by ENGINEER will be similar OWNER's acceptance (either in writing or by failing to <br /> to that provided in subparagraph 6.05.A.2. make written objection thereto by the date indicated <br /> for acceptance or objection in the Bidding Documents <br /> C. Engineer's Evaluation: ENGINEER will be or the Contract Documents) of any such Subcon- <br /> allowed a reasonable time within which to evaluate tractor, Supplier, or other individual or entity so <br /> each proposal or submittal made pursuant to para- identified may be revoked on the basis of reasonable <br /> graphs 6.05.A and 6.05.B. ENGINEER will be the objection after due investigation. CONTRACTOR <br /> sole judge of acceptability. No"or-equal" or substitute shall submit an acceptable replacement for the <br /> will be ordered, installed or utilized until ENGINEER's rejected Subcontractor, Supplier, or other individual or <br /> review is complete, which will be evidenced by either a entity, and the Contract Price will be adjusted by the <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-20 <br /> FAN blic Works\E N G I N E E R I N G DIVISION PROJECTS\1210-Sandridge Driving Range Tee Ren ovationlAdmimlbid documents100700_General Conditions REV 04-07.doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:07-OfficialDocuments:9069,Attachment Id 1,Page 87 <br />