difference in the cost occasioned by such directors, partners, employees, agents, and other
<br /> replacement, and an appropriate Change Order will be consultants and subcontractors of each and any of
<br /> issued or Written Amendment signed. No acceptance them) for all losses and damages caused by, arising
<br /> by OWNER of any such Subcontractor, Supplier, or out of, relating to, or resulting from any of the perils or
<br /> other individual or entity, whether initially or as a causes of loss covered by such policies and any other
<br /> replacement, shall constitute a waiver of any right of property insurance applicable to the Work. If the
<br /> OWNER or ENGINEER to reject defective Work. insurers on any such policies require separate waiver
<br /> forms to be signed by any Subcontractor or Supplier,
<br /> C. CONTRACTOR shall be fully responsible to CONTRACTOR will obtain the same.
<br /> OWNER and ENGINEER for all acts and omissions of
<br /> the Subcontractors, Suppliers, and other individuals or 6.07 Patent Fees and Royalties
<br /> entities performing or furnishing any of the Work just
<br /> as CONTRACTOR is responsible for A. CONTRACTOR shall pay all license fees and
<br /> CONTRACTOR's own acts and omissions. Nothing in royalties and assume all costs incident to the use in
<br /> the Contract Documents shall create for the benefit of the performance of the Work or the incorporation in
<br /> any such Subcontractor, Supplier, or other individual the Work of any invention, design, process, product,
<br /> or entity any contractual relationship between OWNER or device which is the subject of patent rights or
<br /> or ENGINEER and any such Subcontractor, Supplier copyrights held by others. If a particular invention,
<br /> or other individual or entity, nor shall it create any design, process, product, or device is specified in the
<br /> obligation on the part of OWNER or ENGINEER to Contract Documents for use in the performance of the
<br /> pay or to see to the payment of any moneys due any Work and if to the actual knowledge of OWNER or
<br /> such Subcontractor, Supplier, or other individual or ENGINEER its use is subject to patent rights or
<br /> entity except as may otherwise be required by Laws copyrights calling for the payment of any license fee or
<br /> and Regulations. royalty to others, the existence of such rights shall be
<br /> disclosed by OWNER in the Contract Documents. To
<br /> D. CONTRACTOR shall be solely responsible the fullest extent permitted by Laws and Regulations,
<br /> for scheduling and coordinating the Work of Subcon- CONTRACTOR shall indemnify and hold harmless
<br /> tractors, Suppliers, and other individuals or entities OWNER, ENGINEER, ENGI NEER's Consultants, and
<br /> performing or furnishing any of the Work under a the officers, directors, partners, employees or agents,
<br /> direct or indirect contract with CONTRACTOR. and other consultants of each and any of them from
<br /> and against all claims, costs, losses, and damages
<br /> E. CONTRACTOR shall require all Subcontrac- (including but not limited to all fees and charges of
<br /> tors, Suppliers, and such other individuals or entities engineers, architects, attorneys, and other
<br /> performing or furnishing any of the Work to commu- professionals and all court or arbitration or other
<br /> nicate with ENGINEER through CONTRACTOR. dispute resolution costs) arising out of or relating to
<br /> any infringement of patent rights or copyrights incident
<br /> F. The divisions and sections of the Specifica- to the use in the performance of the Work or resulting
<br /> tions and the identifications of any Drawings shall not from the incorporation in the Work of any invention,
<br /> control CONTRACTOR in dividing the Work among design, process, product, or device not specified in the
<br /> Subcontractors or Suppliers or delineating the Work to Contract Documents.
<br /> be performed by any specific trade,
<br /> 6.08 Permits
<br /> G. All Work performed for CONTRACTOR by a
<br /> Subcontractor or Supplier will be pursuant to an A. Unless otherwise provided in the Supple-
<br /> appropriate agreement between CONTRACTOR and mentary Conditions, CONTRACTOR shall obtain and
<br /> the Subcontractor or Supplier which specifically binds pay for all construction permits and licenses. OWNER
<br /> the Subcontractor or Supplier to the applicable terms shall assist CONTRACTOR, when necessary, in
<br /> and conditions of the Contract Documents for the obtaining such permits and licenses. CONTRACTOR
<br /> benefit of OWNER and ENGINEER. Whenever any shall pay all governmental charges and inspection
<br /> such agreement is with a Subcontractor or Supplier fees necessary for the prosecution of the Work which
<br /> who is listed as an additional insured on the property are applicable at the time of opening of Bids, or, if
<br /> insurance provided in paragraph 5.06, the agreement there are no Bids, on the Effective Date of the
<br /> between the CONTRACTOR and the Subcontractor Agreement. CONTRACTOR shall pay all charges of
<br /> or Supplier will contain provisions whereby the utility owners for connections to the Work, and
<br /> Subcontractor or Supplier waives all rights against OWNER shall pay all charges of such utility owners
<br /> OWNER, CONTRACTOR, ENGINEER, ENGINEER's for capital costs related thereto, such as plant
<br /> Consultants, and all other individuals or entities investment fees.
<br /> identified in the Supplementary Conditions to be listed
<br /> as insureds or additional insureds (and the officers,
<br /> 00700-General Conditions REV 04-07.doc
<br /> 00700-21
<br /> FAPubIic WorkslENGINEERING DIVISION PROJECTSl121O-Sandridge Driving Range Tee RenovationlAdmimlbid documentsk00700_General Conditions REV 04-07.doc
<br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:08-OfficialDocuments:9069,Attachment Id 1,Page 88
<br />
|