6.69 Laws and Regulations materials or equipment. CONTRACTOR shall <br /> assume full responsibility for any damage to <br /> A. CONTRACTOR shall give all notices and any such land or area, or to the owner or <br /> comply with all Laws and Regulations applicable to the occupant thereof, or of any adjacent land or <br /> performance of the Work. Except where otherwise areas resulting from the performance of the <br /> expressly required by applicable Laws and Work. <br /> Regulations, neither OWNER nor ENGINEER shall be <br /> responsible for monitoring CONTRACTOR's compli- 2. Should any claim be made by any <br /> ance with any Laws or Regulations. such owner or occupant because of the <br /> performance of the Work, CONTRACTOR shall <br /> B. If CONTRACTOR performs any Work know- promptly settle with such other party by <br /> ing or having reason to know that it is contrary to Laws negotiation or otherwise resolve the claim by <br /> or Regulations, CONTRACTOR shall bear all claims, arbitration or other dispute resolution <br /> costs, losses, and damages (including but not limited proceeding or at law, <br /> to all fees and charges of engineers, architects, <br /> attorneys, and other professionals and all court or 3. To the fullest extent permitted by <br /> arbitration or other dispute resolution costs) arising out Laws and Regulations, CONTRACTOR shall <br /> of or relating to such Work; however, it shall not be indemnify and hold harmless OWNER, <br /> CONTRACTOR's primary responsibility to make ENGINEER, ENGINEER's Consultant, and the <br /> certain that the Specifications and Drawings are in officers, directors, partners, employees, agents, <br /> accordance with Laws and Regulations, but this shall and other consultants of each and any of them <br /> not relieve CONTRACTOR of CONTRACTOR's from and against all claims, costs, losses, and <br /> obligations under paragraph 3.03. damages (including but not limited to all fees <br /> and charges of engineers, architects, attorneys, <br /> C. Changes in Laws or Regulations not known at and other professionals and all court or <br /> the time of opening of Bids (or, on the Effective Date arbitration or other dispute resolution costs) <br /> of the Agreement if there were no Bids) having an arising out of or relating to any claim or action, <br /> effect on the cost or time of performance of the Work legal or equitable, brought by any such owner <br /> may be the subject of an adjustment in Contract Price or occupant against OWNER, ENGINEER, or <br /> or Contract Times. If OWNER and CONTRACTOR any other party indemnified hereunder to the <br /> are unable to agree on entitlement to or on the extent caused by or based upon <br /> amount or extent, if any, of any such adjustment, a CONTRACTOR's performance of the Work. <br /> Claim may be made therefor as provided in paragraph <br /> 10.65. B. Removal of Debris During Performance of the <br /> Work: During the progress of the Work CONTRAC- <br /> 6.10 Taxes TOR shall keep the Site and other areas free from <br /> accumulations of waste materials, rubbish, and other <br /> A. CONTRACTOR shall pay all sales, consum- debris. Removal and disposal of such waste wateri- <br /> er, use, and other similar taxes required to be als, rubbish, and other debris shall conform to applica- <br /> paid by CONTRACTOR in accordance with ble Laws and Regulations. <br /> the Laws and Regulations of the place of the <br /> Project which are applicable during the C. Cleaning: Prior to Substantial Completion of <br /> performance of the Work. the Work CONTRACTOR shall clean the Site and <br /> make it ready for utilization by OWNER. At the com- <br /> B. OWNER qualifies for state and local sales tax pletion of the Work CONTRACTOR shall remove from <br /> exemption in the purchase of all material and the Site all tools, appliances, construction equipment <br /> equipment. and machinery, and surplus materials and shall <br /> restore to original condition all property not designated <br /> 6.11 Use of Site and Other Areas for alteration by the Contract Documents. <br /> A. Limitation on Use of Site and Other Areas D. Loading Structures: CONTRACTOR shall not <br /> load nor permit any part of any structure to be loaded <br /> 1. CONTRACTOR shall confine in any manner that will endanger the structure, nor <br /> construction equipment, the storage of shall CONTRACTOR subject any part of the Work or <br /> materials and equipment, and the operations of adjacent property to stresses or pressures that will <br /> workers to the Site and other areas permitted endanger it. <br /> by Laws and Regulations, and shall not <br /> unreasonably encumber the Site and other <br /> areas with construction equipment or other <br /> 00700 e General Conditions REV 04-07.doc <br /> 00700-22 <br /> FAP ublic Works\ENGINEERING DIVISION PROJECTS11210-Sandridge Driving Range Tee Re novation\Admimlbid documentsl00700-General Conditions REV 04-07,doc <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:08-OfficialDocuments:9069,Attachment Id 1,Page 89 <br />