Laserfiche WebLink
Change Order or when a Claim for an adjustment in Subcontractor is to be paid on the basis of Cost <br /> Contract Price is determined on the basis of Cost of of the Work plus a fee, the Subcontractor's <br /> the Work, the costs to be reimbursed to Cost of the Work and fee shall be determined <br /> CONTRACTOR will be only those additional or in the same manner as CONTRACTOR's Cost <br /> incremental costs required because of the change in of the Work and fee as provided in this para- <br /> the Work or because of the event giving rise to the graph 11.01. <br /> Claim. Except as otherwise may be agreed to in <br /> writing by OWNER, such costs shall be in amounts no 4. Costs of special consultants <br /> higher than those prevailing in the locality of the (including but not limited to engineers, <br /> Project, shall include only the following items, and architects, testing laboratories, surveyors, <br /> shall not include any of the costs itemized in para- attorneys, and accountants) employed for <br /> graph 11.01.13. services specifically related to the Work. <br /> 1. Payroll costs for employees in the 5. Supplemental costs including the <br /> direct employ of CONTRACTOR in the perfor- following: <br /> mance of the Work under schedules of job <br /> classifications agreed upon by OWNER and a. The proportion of necessary trans- <br /> CONTRACTOR. Such employees shall include portation, travel, and subsistence expenses of <br /> without limitation superintendents, foremen, CONTRACTOR's employees incurred in dis- <br /> and other personnel employed full time at the charge of duties connected with the Work. <br /> Site. Payroll costs for employees not employed <br /> full time on the Work shall be apportioned on b. Cost, including transportation and <br /> the basis of their time spent on the Work. maintenance, of all materials, supplies, equip- <br /> Payroll costs shall include, but not be limited to, ment, machinery, appliances, office, and <br /> salaries and wages plus the cost of fringe temporary facilities at the Site, and hand tools <br /> benefits, which shall include social security not owned by the workers,which are consumed <br /> contributions, unemployment, excise, and in the performance of the Work, and cost, less <br /> payroll taxes, workers' compensation, health market value, of such items used but not con- <br /> and retirement benefits, bonuses, sick leave, sumed which remain the property of CON- <br /> vacation and holiday pay applicable thereto. TRACTOR. <br /> The expenses of performing Work outside of <br /> regular working hours, on Saturday, Sunday, or C. Rentals of all construction equip- <br /> legal holidays, shall be included in the above to ment and machinery, and the parts thereof <br /> the extent authorized by OWNER. whether rented from CONTRACTOR or others <br /> in accordance with rental agreements approved <br /> 2. Cost of all materials and equipment by OWNER with the advice of ENGINEER, and <br /> furnished and incorporated in the Work, includ- the costs of transportation, loading, unloading, <br /> ing costs of transportation and storage thereof, assembly, dismantling, and removal thereof. <br /> and Suppliers' field services required in All such costs shall be in accordance with the <br /> connection therewith. All cash discounts shall terms of said rental agreements. The rental of <br /> accrue to CONTRACTOR unless OWNER any such equipment, machinery, or parts shall <br /> deposits funds with CONTRACTOR with which cease when the use thereof is no longer <br /> to make payments, in which Case the cash necessary for the Work. <br /> discounts shall accrue to OWNER. All trade <br /> discounts, rebates and refunds and returns d. Sales, consumer, use, and other <br /> from sale of surplus materials and equipment similar taxes related to the Work, and for which <br /> shall accrue to OWNER, and CONTRACTOR CONTRACTOR is liable, imposed by Laws and <br /> shall make provisions so that they may be Regulations. <br /> obtained. <br /> e. Deposits lost for causes other than <br /> 3. Payments made by CONTRACTOR negligence of CONTRACTOR, any Sub- <br /> to Subcontractors for Work performed by contractor, or anyone directly or indirectly <br /> Subcontractors. If required by OWNER, CON-- employed by any of them or for whose acts any <br /> TRACTOR shall obtain competitive bids from of them may be liable, and royalty payments <br /> subcontractors acceptable to OWNER and and fees for permits and licenses. <br /> CONTRACTOR and shall deliver such bids to <br /> OWNER, who will then determine, with the f. Losses and damages (and related <br /> advice of ENGINEER, which bids, if any, will be expenses) caused by damage to the Work, not <br /> acceptable. If any subcontract provides that the compensated by insurance or otherwise, sus- <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-31 <br /> F:1Publio Works\E N G I N E E R I N G DIVISION PRGJECTS\1210-Sandridge Driving Range Tee Renovation\Admimlbid doouments100700--General Conditions REV 04-07.doe <br /> SmeadSoft Reprint Date:Monday,January 11,2016-09:22:10-OfficialDocuments:9069,Attachment Id 1,Page 98 <br />