Laserfiche WebLink
3.3 INSTALLATION <br />A. Install overhead doors and track in accordance with approved shop drawings and the manufacturer's <br />printed instructions. <br />B. Coordinate installation with adjacent work to ensure proper clearances and allow for maintenance. <br />C. Anchor assembly to wall construction and building framing without distortion or stress. <br />D. Securely brace door tracks suspended from structure. Secure tracks to structural members only <br />E. Fit and align door assembly including hardware. <br />F Coordinate installation of electrical service. Complete power and control wiring from disconnect to <br />unit components. <br />3.4 CLEANING AND ADJUSTING <br />A. Adjust door assembly to smooth operation and in full contact with weatherstripping. <br />B Clean doors, frames and glass. <br />C. Remove temporary labels and visible markings. <br />3.5 PROTECTION <br />A. Do not permit construction traffic through overhead door openings after adjustment and cleaning. <br />B. Protect installed products until completion of project. <br />C Touch-up, damaged coatings and finishes and repair minor damage before Substantial Completion. <br />END OF SECTION 08630 <br />Indian River County Skeet and Trap 08630 — 4 <br />DAA Project No 2013 04 11/12/15 Bid Set —ADDENDUM 141 <br />