Laserfiche WebLink
d. Center and End Stiles: 16 gauge steel. <br />e. Springs: <br />1) 25,000 cycles. <br />2. Finish and Color: Two coat baked -on polyester, white color. <br />3. Windload Design: Provide to meet the Design/Performance requirements as specified. on the <br />Structural Drawings <br />4. Hardware: Galvanized steel hinges and fixtures. Ball bearing rollers with hardened steel races. <br />5 Lock: <br />a. Keyed lock with interlock switch for automatic operator. <br />6 Weatherstripping: <br />a. Flexible bulb -type strip at bottom section. <br />b Flexible Jamb seals. <br />c Flexible Header seal. <br />7. Track: Provide track as recommended by manufacturer to suit loading required and clearances <br />available. <br />8. Electric Motor Operation. Provide UL listed electric operator, size and type as recommended <br />by manufacturer to move door in either direction at not less than 2/3 foot nor more than 1 foot <br />per second. Operator shall meet UL325/2010 requirements for continuous monitoring of safety <br />devices. <br />a. Entrapment Protection. Required for momentary contact, includes radio control <br />operation. <br />1) Photoelectric sensors monitored to meet UL 325/2010. <br />b. Operator Controls. <br />1) Push-button and key operated control stations with open, close, and stop buttons. <br />2) Surface mounting. <br />3) Interior location. <br />c. Special Operation: <br />1) • Vehicle detector operation. <br />2) Radio control operation. <br />3) Commercial light package. <br />PART 3 EXECUTION <br />3.1 EXAMINATION <br />A. Do not begin installation until openings have been properly prepared. <br />B. Verify wall openings are ready to receive work and opening dimensions and tolerances are within <br />specified limits. <br />C Verify electric power is available and of correct characteristics. <br />D If preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation <br />before proceeding. <br />3.2 PREPARATION <br />A. Clean surfaces thoroughly prior to installation. <br />B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result <br />for the substrate under the project conditions. <br />Indian River County Skeet and Trap 08630 — 3 <br />DAA Project No. 2013 04 11/12/15 Bid Set —ADDENDUM #1 <br />