My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-241A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-241A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:04:20 AM
Creation date
1/11/2016 11:38:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-241A
Agenda Item Number
8.L.
Entity Name
West Construction Inc.
Subject
Contrac and Specifications
Skeet and Trap Facility Improvements
Indian River Count Public Shooting Range
Area
Indian River County Public Shooting Range
Project Number
1213B
Bid Number
2016008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />Project Consultants <br />Donadio and Associates Architects, PA <br />MBV Engineering, Inc. <br />Utilities <br />Florida Power & Light <br />Other Issues <br />• Maintenance of Traffic — the IRC Shooting Range is open, so Contractor (and all <br />subs) shall be cognizant of people and vehicles at all times. <br />• Permits <br />o St. Johns River Water Management District <br />o US Department of the Army Corps of Engineers <br />o IRC Type B Stormwater Management System <br />o IRC Land Clearing <br />o IRC Tree Removal <br />o IRC Wetland Resource <br />o IRC Site Plan Approval <br />o The CONTRACTOR shall obtain the Indian River County building permit(s) for <br />the project. The OWNER will pay the necessary building permit fees. The <br />building permit is ready for issuance to a qualified CONTRACTOR. The <br />CONTRACTOR shall obtain and pay for all other required permits and licenses. <br />The CONTRACTOR shall provide copies of the permits to the OWNER and <br />ENGINEER and shall comply with all conditions contained in the permits at no <br />extra cost to the OWNER. <br />[The remainder of this page was left blank intentionally] <br />F \Public Works\ENGINEERING DIVISION PROJECTS\I213B-IRC Shooting Range Skeet & Trap Phase 2\Admin\Meetings\Pre-bid Meeting Minutes 11- <br />18-2015.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.