Laserfiche WebLink
3 <br />Questions <br />Are there any restrictions to access the parameters of the project at the IRC Shooting <br />Range for a site visit? <br />A site visit was scheduled following the completion of this Mandatory Pre -Bid meeting at <br />the Indian River County Public Shooting Range. Anyone not able to attend this site visit <br />was asked to email Rich Szpyrka per the Contract Documents (Section 00200 Instructions <br />to Bidders) and request to set up a time either Thursday, November 19, 2015 from 10:00 <br />a.m. — 4:00 p.m. or Friday, November 20, 2015 from 10:00 a.m. — 4:00 p.m. A <br />representative from the Engineering Division must be in attendance for field visits. <br />Will the Trap range be open during weekend during construction? <br />This decision will be made at the pre -construction meeting following the award of bid to <br />the successful bidder. <br />What about the expansion of the parking area — customers taking out survey stakes, etc.? <br />As long as the project area is properly barricaded from the existing paved parking area, <br />there should be no issues. <br />In the bid docs, it mentions that the building permit will be obtained by the Contractor <br />and paid for by Indian River County. What other permits would be applicable? <br />The only permit the Contractor will be required to obtain, pay for and maintain is the <br />NPDES permit from St. Johns River Water Management District. <br />What drove the value for the liquidated damages? <br />The liquidated damages for this project ($1,742.00 per day) are derived directly from the <br />2015 FDOT Standard Specifications for Road and Bridge Construction, Section 8.10-2. <br />FDOT protocol is following on all site plans, roadway projects, subdivisions, etc. <br />F -\Public Works\ENGINEERING DIVISION PROJECTS\1213B-IRC Shooting Range Skeet & Trap Phase 2\Admin\Meetings\Pre-bid Meeting Minutes 11- <br />18-2015 doc <br />